Comprehensive Risk Management using Fuzzy FMEA and MCDA Techniques in Highway Construction Projects
暂无分享,去创建一个
Mohsen Ahmadi | Zoran Kapelan | Abdollah Ardeshir | Kourosh Behzadian | Z. Kapelan | K. Behzadian | A. Ardeshir | M. Ahmadi
[1] Lukas Ferkl,et al. Probabilistic risk assessment of highway tunnels , 2011 .
[2] Tarek Zayed,et al. Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .
[3] C. Sheu,et al. Choosing a project risk-handling strategy: An analytical model , 2008 .
[4] I. Asi,et al. OPTIMIZATION OF ROLLER-COMPACTED CONCRETE FOR LOCAL APPLICATION , 1994 .
[5] Abbas Rashidi,et al. An automated procedure for selecting project managers in construction firms , 2013 .
[6] Siamak Noori,et al. An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions , 2009, Risk analysis : an official publication of the Society for Risk Analysis.
[7] Aminah Robinson Fayek,et al. Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP , 2010 .
[8] Edmundas Kazimieras Zavadskas,et al. Risk assessment of construction projects , 2010 .
[9] Stephen Grey,et al. Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements , 2004 .
[10] Raufdeen Rameezdeen,et al. Risk management in road construction: The case of Sri Lanka , 2009 .
[11] Remi Jouandou,et al. Dealing with Uncertainty: Selecting a Risk-Analysis Tool on the Basis of Project Characteristics and Phases , 2010 .
[12] M J Maher,et al. Risk-based cost and schedule estimation for large transportation projects , 2006 .
[13] Aminah Robinson Fayek,et al. Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis , 2011 .
[14] Ming-Teh Wang,et al. Risk Allocation and Risk Handling of Highway Projects in Taiwan , 2003 .
[15] Abbas Rashidi,et al. Selection of Project Managers in Construction Firm s Using Analytic Hierarchy Process (AHP) and Fuzzy Topsis: A Case Study , 2011 .
[16] Keith R. Molenaar,et al. Risk Assessment and Allocation for Highway Construction Management , 2006 .
[17] Donald D. Tippett,et al. Project Risk Management Using the Project Risk FMEA , 2004 .
[18] Ibrahim Mahamid,et al. Risk matrix for factors affecting time delay in road construction projects: owners' perspective , 2011 .
[19] Johnny Wong,et al. Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects , 2010 .
[20] Keith R. Molenaar,et al. A Risk-Based Approach to Contingency Estimation in Highway Project Development , 2009 .
[21] A. P. Sant’Anna. Probabilistic priority numbers for failure modes and effects analysis , 2012 .
[22] Ioannis Brilakis,et al. Neurofuzzy Genetic System for Selection of Construction Project Managers , 2011 .
[23] Abdollah Ardeshir,et al. Selection of a Bridge Construction Site Using Fuzzy Analytical Hierarchy Process in Geographic Information System , 2014 .
[24] Khaled Nassar,et al. Evaluating Cost Overruns of Asphalt Paving Project using Statistical Process Control Methods , 2005 .
[25] Thomas L. Saaty,et al. Decision Making for Leaders: The Analytical Hierarchy Process for Decisions in a Complex World , 1982 .