Calculation of the Elastic Demand Curve for a Day-Ahead Secondary Reserve Market
暂无分享,去创建一个
Pablo Frias | Carlos A Platero | T. Gómez | C. Platero | D. Soler | P. Frías | David Soler | Tomas Gomez
[1] V. Brandwajn,et al. Efficient bounding method for linear contingency analysis , 1988 .
[2] L. H. Fink,et al. Understanding automatic generation control , 1992 .
[3] P. Kundur,et al. Power system stability and control , 1994 .
[4] Wenyuan Li,et al. Reliability Assessment of Electric Power Systems Using Monte Carlo Methods , 1994 .
[5] Michael C. Fu,et al. Conditional Monte Carlo , 1997 .
[6] B. Kirby,et al. Creating competitive markets for ancillary services , 1997 .
[7] M. L. Kothari,et al. Automatic generation control of an interconnected power system under deregulated environment , 1998, Power Quality '98.
[8] B. Delfino,et al. Power system automatic generation control revised from the open trading perspective , 1999, PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376).
[9] A. Papalexopoulos,et al. Competitive procurement of ancillary services by an independent system operator , 1999 .
[10] K. Tomsovic,et al. Feasibility of a Bilateral Market for Load Following , 2001, IEEE Power Engineering Review.
[11] K. Uhlen,et al. Market based AGC with online bidding of regulating reserves , 2001, 2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262).
[12] F. Gubina,et al. Cost-based models for the power-reserve pricing of frequency control , 2004, IEEE Transactions on Power Systems.
[13] R. R. Pecharromán,et al. New design for the Spanish AGC scheme using an adaptive gain controller , 2004, IEEE Transactions on Power Systems.
[14] J.M.M. Ortega,et al. Load following control issues in the Spanish power system , 2004, IEEE Power Engineering Society General Meeting, 2004..
[15] Jianxue Wang,et al. Operating reserve model in the power market , 2005 .
[16] François Bouffard,et al. Scheduling and Pricing of Coupled Energy and Primary, Secondary, and Tertiary Reserves , 2005, Proceedings of the IEEE.
[17] D. Kirschen,et al. A Survey of Frequency and Voltage Control Ancillary Services—Part I: Technical Features , 2007, IEEE Transactions on Power Systems.
[18] M. Eremia,et al. Trading Ancillary Services for Frequency Regulation in Competitive Electricity Markets , 2007, 2007 IEEE Lausanne Power Tech.
[19] D. Kirschen,et al. A Survey of Frequency and Voltage Control Ancillary Services—Part II: Economic Features , 2007, IEEE Transactions on Power Systems.
[20] Daniel S. Kirschen,et al. Optimizing the spinning reserve requirements using a cost/benefit analysis , 2008, PES 2008.
[21] P. Frias,et al. A Reactive Power Capacity Market Using Annual Auctions , 2008, IEEE Transactions on Power Systems.
[22] Jian-Qiang Hu,et al. Conditional Monte Carlo: Gradient Estimation and Optimization Applications , 2012 .