Reliability Goals for Next Generation Launch Vehicle Liquid Propulsion
暂无分享,去创建一个
[1] Gaspare Maggio,et al. Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation, volume 1 , 1995 .
[2] G. Maggio,et al. Risk-based evaluation of launch vehicle propulsion system designs , 1996 .
[3] R. Biggs. A probabilistic risk assessment for the Space Shuttle Main Engine with a turbomachinery vibration monitor cutoff system , 1990 .
[4] G. Maggio. Space Shuttle probabilistic risk assessment: methodology and application , 1996, Proceedings of 1996 Annual Reliability and Maintainability Symposium.