A simulation study of performance of MRP based systems under interaction effects
暂无分享,去创建一个
[1] Dean H. Kropp,et al. A Lot-Sizing Algorithm for Reducing Nervousness in MRP Systems , 1984 .
[2] Robert A. Davis,et al. Interaction effects on MRP nervousness , 1990 .
[3] Candace Arai Yano,et al. Buffering against demand uncertainty in material requirements planning systems : systems with no emergency setups , 1985 .
[4] Alfred Büchel,et al. Stochastic material requirements planning for optional parts , 1983 .
[5] Joseph R. Biggs. Priority rules for shop floor control in a material requirements planning system under various levels of capacity , 1985 .
[6] Chrwan-Jyh Ho,et al. Evaluating the impact of operating environments on MRP system nervousness , 1989 .
[7] J. Wacker. A theory of material requirements planning (MRP): an empirical methodology to reduce uncertainty in MRP systems , 1985 .
[8] Roberta J Minifie,et al. Survey of MRP nervousness issues , 1986 .
[9] Peter A. Pinto,et al. Performance of Lot-Sizing Rules In an MRP System With Different Operating Conditions , 1980 .
[10] Dean H. Kropp,et al. A comparison of strategies to dampen nervousness in MRP systems , 1986 .
[11] Richard James Penlesky. Open order rescheduling for MRP systems in manufacturing firms , 1982 .
[12] J.Roberta Minifie,et al. On the generalizability of MRP simulation results , 1985 .
[13] D. Collier. A comparison of MRP lot sizing methods considering capacity change costs , 1980 .
[14] R. C. Carlson,et al. Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .
[15] Richard A. Wysk,et al. Capacity control policies for MRP systems , 1986 .
[16] H Mather,et al. Reschedule the reschedules you just rescheduled - Way of life for MRP? , 1977 .
[17] V. Sridharan,et al. Master production scheduling make-to-stock products: a framework for analysis , 1990 .
[18] Timothy D. Fry,et al. The effects of product structure and sequencing rule on assembly shop performance , 1989 .