Risk‐based metrics for performance evaluation of control charts
暂无分享,去创建一个
[1] Sven Knoth,et al. The Art of Evaluating Monitoring Schemes — How to Measure the Performance of Control Charts? , 2006 .
[2] Douglas C. Montgomery,et al. Introduction to Statistical Quality Control , 1986 .
[3] Wilbert C.M. Kallenberg,et al. Are estimated control charts in control? , 2001 .
[4] Ron S. Kenett,et al. On Assessing the Performance of Sequential Procedures for Detecting a Change , 2012, Qual. Reliab. Eng. Int..
[5] Russell A. Boyles,et al. Phase I Analysis for Autocorrelated Processes , 2000 .
[6] Stefan H. Steiner,et al. An Overview of Phase I Analysis for Process Improvement and Monitoring , 2014 .
[7] Christian H. Weiß,et al. EWMA Monitoring of Correlated Processes of Poisson Counts , 2009 .
[8] Sven Knoth. Run length quantiles of EWMA control charts monitoring normal mean or/and variance , 2015 .
[9] Axel Gandy,et al. Guaranteed Conditional Performance of Control Charts via Bootstrap Methods , 2011, 1111.4180.
[10] D. Tasche,et al. On the coherence of expected shortfall , 2001, cond-mat/0104295.
[11] Murat Caner Testik,et al. Conditional and marginal performance of the Poisson CUSUM control chart with parameter estimation , 2007 .
[12] Murat Caner Testik,et al. CUSUM Monitoring of First-Order Integer-Valued Autoregressive Processes of Poisson Counts , 2009 .
[13] Jaime Mosquera,et al. Simultaneously guaranteeing the in‐control and out‐of‐control performances of the S2 control chart with estimated variance , 2018, Qual. Reliab. Eng. Int..
[14] Bing Xing Wang,et al. The Design of the S2 Control Charts Based on Conditional Performance via Exact Methods , 2017, Qual. Reliab. Eng. Int..
[15] D. A. Evans,et al. An approach to the probability distribution of cusum run length , 1972 .
[16] E. S. Page. CONTINUOUS INSPECTION SCHEMES , 1954 .
[17] Rainer Göb,et al. Estimating value at risk and conditional value at risk for count variables , 2011, Qual. Reliab. Eng. Int..