Operation-based flowtime estimation in a dynamic job shop
暂无分享,去创建一个
[1] T.C.E. Cheng. Simulation study of job shop scheduling with due dates , 1988 .
[2] Ming-Hua Ye,et al. An expediting heuristic for the shortest processing time dispatching rule , 1991 .
[3] Timothy D. Fry,et al. Due Date Assignment in a Multistage Job Shop , 1989 .
[4] Silvanus T. Enns. Lead time selection and the behaviour of work flow in job shops , 1998, Eur. J. Oper. Res..
[5] Shigeji Miyazaki,et al. Combined scheduling system for reducing job tardiness in a job shop , 1981 .
[6] Samuel Eilon,et al. Due dates in job shop scheduling , 1976 .
[7] J. A. Buzacott,et al. Open queueing network models of dynamic job shops , 1981 .
[8] S. T. Enns. Job shop flowtime prediction and tardiness control using queueing analysis , 1993 .
[9] J. A. Buzacott,et al. On Approximate Queueing Models of Dynamic Job Shops , 1985 .
[10] James K. Weeks. A Simulation Study of Predictable Due-Dates , 1979 .
[11] Loren Paul Rees,et al. Using Neural Networks to Determine Internally-Set Due-Date Assignments for Shop Scheduling* , 1994 .
[12] Charles A. Holloway,et al. Job Shop Scheduling with Due Dates and Overtime Capability , 1974 .
[13] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .
[14] John J. Kanet,et al. Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times , 1989 .
[15] Ranga V. Ramasesh. Dynamic job shop scheduling: A survey of simulation research , 1990 .
[16] J. Bertrand. The Effect of Workload Dependent Due-Dates on Job Shop Performance , 1983 .
[17] S. T. Enns,et al. A dynamic forecasting model for job shop flowtime prediction and tardiness control , 1995 .
[18] Bernard W. Taylor,et al. Estimating Job Flow-Times in a Job Shop for Contractually Negotiated Due-Dates , 1982 .
[19] Kevin J. Dooley,et al. Dynamic rules for due-date assignment , 1991 .
[20] S. T. Enns,et al. Job shop leadtime requirements under conditions of controlled delivery performance , 1994 .
[21] J. Shanthikumar,et al. Approximations for the time spent in a dynamic job shop with applications to due-date assignment , 1988 .
[22] T.C.E. Cheng,et al. Due-date determination for an single-machine shop with SPT dispatching , 1986 .
[23] Charles H. Smith,et al. Selecting allowance policies for improved job shop performance , 1993 .
[24] Ali Tamer Unal,et al. A probabilistic cost-based due date assignment model for job shops , 1993 .
[25] S. Weisberg. Applied Linear Regression , 1981 .
[26] T. Hassard,et al. Applied Linear Regression , 2005 .
[27] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[28] V. Barnett,et al. Applied Linear Statistical Models , 1975 .
[29] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[30] T.C.E. Cheng. Analysis of Job Flow-Time in a Job Shop , 1985 .
[31] Stephen R. Lawrence,et al. Estimating flowtimes and setting due-dates in complex production systems , 1995 .
[32] G. Ragatz,et al. A simulation analysis of due date assignment rules , 1984 .
[33] Randall P. Sadowski,et al. Introduction to Simulation Using Siman , 1990 .
[34] Kevin J. Dooley,et al. Mixing static and dynamic flowtime estimates for due-date assignment , 1993 .
[35] Michael H. Kutner. Applied Linear Statistical Models , 1974 .
[36] T. Cheng. Optimal Due‐date Assignment in an Assembly Shop , 1994 .