Construction of Deep Foundation Ditch Neighboring Subway
暂无分享,去创建一个
The distance between the exterior protection wall of foundation ditch of Wanxiang International Plaza and the side of subways is only 3 meters, and they were constucted at the same time. In the construction of Wanxiang International Plaza, many techniques such as scientific construction procedure and information alized construction were adopted to make the protection structure strong and bear such tests as subway shield driving, subway earthwork excavation and sustainer demolition blasting and so on.