Determining the capacity and its level of utilization in make-to-order manufacturing: A simple deterministic model for single-machine multiple-product case

Abstract A simple deterministic model is developed to determine the capacity and its level of utilization for a single specific machine producing multiple products in make-to-order manufacturing plants. It integrates the variables of processing time, set-up time, product defective rate, and maintenance downtime. The number of product types and the number of lots per product are critical determinants. The model first computes the net production quantities per unit of time for each product type and for the product mixtures, and then, capacity utilization figures are derived based on the net capacity inverse coefficients and net product quantities per planned time unit for each product type and product mixture.

[1]  James E. Kennedy An Analysis of Time-Series Estimates of Capacity Utilization , 1998 .

[2]  S K Goyal,et al.  Production capacity planning and control in multi-stage manufacturing , 1998, J. Oper. Res. Soc..

[3]  Kathleen Segerson,et al.  On the measurement of economic capacity utilization for multi-product industries , 1990 .

[4]  W. Tsai,et al.  Decision making of sourcing and order allocation with price discounts , 2010 .

[5]  Victoria L. Crittenden,et al.  Examining the impact of manufacturing and marketing capacity decisions on firm profitability , 1995 .

[6]  Jonathan P. Pinder,et al.  A revenue management approach to demand management and order booking in assemble-to-order manufacturing , 1995 .

[7]  S. Sridharan,et al.  Managing capacity in tightly constrained systems , 1998 .

[8]  A. Marucheck,et al.  Planning Capacity Utilization in an Assemble‐to‐Order Environment , 1992 .

[9]  V. Sridharan,et al.  Capacity rationing in multi-period planning environments , 1996 .

[10]  Mehmet Barut,et al.  Design and evaluation of a dynamic capacity apportionment procedure , 2004, Eur. J. Oper. Res..

[11]  William W. Trigeiro,et al.  Capacitated lot sizing with setup times , 1989 .

[12]  Zafer Achi,et al.  Managing Capacity in Basic Materials , 1996 .

[13]  Reginald Tomas Yu-Lee Essentials of Capacity Management , 2002 .

[14]  G. M. Folie A Simple Model for Computing the Trade-Offs between Plant Capacity and Operating Strategies , 1974 .

[15]  Jeonghan Ko,et al.  Design of multi-product manufacturing lines with the consideration of product change dependent inter-task times, reduced changeover and machine flexibility , 2010 .

[16]  Diwakar Gupta,et al.  Capacity Management for Contract Manufacturing , 2007, Oper. Res..

[17]  Ahmed M. Deif,et al.  A control approach to explore the dynamics of capacity scalability in reconfigurable manufacturing systems , 2006 .

[18]  Arthur De Vany,et al.  Stochastic Equilibrium and Capacity Utilization , 1981 .

[19]  Nagraj Balakrishnan,et al.  Rationing Capacity Between Two Product Classes , 1996 .

[20]  Nagraj Balakrishnan,et al.  Robustness of capacity rationing policies , 1999, Eur. J. Oper. Res..

[21]  D. Squires,et al.  Capacity and Capacity Utilization in Common-pool Resource Industries , 2002 .

[22]  Kaoru Tone,et al.  Decomposing capacity utilization in data envelopment analysis: An application to banks in India , 2009, Eur. J. Oper. Res..

[23]  Demet Bayraktar,et al.  Improvement of capacity utilization in a subcontracting small scale manufacturing company , 1999 .

[24]  Brian G. Kingsman,et al.  Performance analysis of make-to-order manufacturing systems under different workload control regimes , 2004 .

[25]  Birger Rapp,et al.  Balancing capacity and lot sizes , 1985 .

[26]  J. Will M. Bertrand,et al.  A study of simple rules for subcontracting in make-to-order manufacturing , 2001, Eur. J. Oper. Res..

[27]  Hui-Chieh Li,et al.  An integrated plant capacity and production planning model for high-tech manufacturing firms with economies of scale , 2009 .

[28]  Hans-Jakob Lüthi,et al.  Scheduling to Minimize Maximum Workload , 1985 .

[29]  Samuel E. Bodily,et al.  A Taxonomy and Research Overview of Perishable-Asset Revenue Management: Yield Management, Overbooking, and Pricing , 1992, Oper. Res..

[30]  Sheng-Hung Chang,et al.  Model to determine the backup capacity of a wafer foundry , 2005 .

[31]  F. Turco,et al.  Modelling plant capacity and productivity: conceptual framework in a single-machine case , 2005 .

[32]  S. Bodily,et al.  Perishable-asset revenue management: Generic and multiple-price yield management with diversion , 1995 .

[33]  Marvin B. Lieberman,et al.  Capacity utilization: Theoretical models and empirical tests , 1989 .

[34]  R. Färe,et al.  Measuring Plant Capacity, Utilization and Technical Change: A Nonparametric Approach , 1989 .

[35]  Jong-Kun Lee,et al.  Comparative performance of short-run capacity utilization measures , 1995 .

[36]  Omar Licandro,et al.  Capacity utilization and market power , 1997 .