A Modeling Approach to Understand Performance of Lean Project Delivery System

Many authors suggest that to overcome the problems of the construction industry such as adversarial relationships, low rates of productivity, lack of cooperation, ineffective communications, etc., it is necessary to move toward a better coordination of participants and more collaborative and integrated approaches (e.g. Lean Project Delivery (LPD)). Currently, there is not enough experience and information to understand (1) the adoption of LPD in the construction industry, and (2) the operation of LPD with respect to its organizational structure, operational system, and contractual relationships in a comprehensive manner. The purpose of this paper is to present a research initiative currently in progress that involves the development of models that can help to understand the factors that affect performance of LPD and their mechanisms to impact project results. The development of robust modeling capabilities for LPD can contribute to a better use and design of these systems. The paper provides a review of the literature on project delivery systems and explores the potential use of different modeling approaches to characterize the performance of LPD. A research methodology to develop and test the models is described for analysis and feedback from fellow researchers.

[1]  Mark Konchar,et al.  Comparison of U.S. Project Delivery Systems , 1998 .

[2]  Christopher M. Gordon,et al.  Choosing Appropriate Construction Contracting Method , 1994 .

[3]  Ashutosh Tiwari,et al.  Modelling collaboration using complex networks , 2011, Inf. Sci..

[4]  Paul Chinowsky,et al.  Project Organizations as Social Networks , 2010 .

[5]  Keith R. Molenaar,et al.  MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .

[6]  Xiaolong Xue,et al.  Critical Review of Collaborative Working in Construction Projects: Business Environment and Human Behaviors , 2010 .

[7]  Binshan Lin,et al.  Project delivery system selection of construction projects in China , 2011, Expert Syst. Appl..

[8]  Islam H. El-adaway Integrated Project Delivery Case Study: Guidelines for Drafting Partnering Contract , 2010 .

[9]  Eddy M. Rojas,et al.  Social Network Analysis of Collaborative Ventures for Overseas Construction Projects , 2011 .

[10]  Khadija Iqbal,et al.  An introduction , 1996, Neurobiology of Aging.

[11]  C Patricio Venegas,et al.  Selecting Long-Term Strategies for Construction Firms , 1997 .

[12]  William A. Lichtig,et al.  The Integrated Agreement for Lean Project Delivery , 2010 .

[13]  Raymond E. Levitt,et al.  The Virtual Design Team: A Computer Simulation Framework for Studying Organizational Aspects of Concurrent Design , 1995, Simul..

[14]  Luis F. Alarcón,et al.  Modeling project performance for decision making , 1996 .

[15]  Glenn Ballard,et al.  The Lean Project Delivery System: An Update , 2008 .

[16]  Stephen Emmitt,et al.  Lean and integrated project delivery , 2011 .

[17]  Mohan M. Kumaraswamy,et al.  Potential for Implementing Relational Contracting and Joint Risk Management , 2004 .

[18]  YAN JIN,et al.  The virtual design team: A computational model of project organizations , 1996, Comput. Math. Organ. Theory.

[19]  Ali Mostafavi,et al.  Selecting Appropriate Project Delivery System: Fuzzy Approach with Risk Analysis , 2010 .

[20]  Thomas Olofsson,et al.  Relational contracting and process design promoting cooperation , 2006 .

[21]  Glenn Ballard,et al.  Contracting for Lean Performance: Contracts and the Lean Construction Team , 1997 .

[22]  Eric Bonabeau,et al.  Agent-based modeling: Methods and techniques for simulating human systems , 2002, Proceedings of the National Academy of Sciences of the United States of America.