Performance Analysis of EWMA Controllers Subject to Metrology Delay
暂无分享,去创建一个
[1] Dean V. Neubauer. Statistical Process Adjustment for Quality Control , 2003, Technometrics.
[2] Gwilym M. Jenkins,et al. Time series analysis, forecasting and control , 1972 .
[3] E. Jury. A Simplified Stability Criterion for Linear Discrete Systems , 1962, Proceedings of the IRE.
[4] Ruey-Shan Guo,et al. Age-based double EWMA controller and its application to CMP processes , 2001 .
[5] T. Harris. Assessment of Control Loop Performance , 1989 .
[6] Shi-Shang Jang,et al. Stability and performance analysis of mixed product run-to-run control , 2006 .
[7] S. J. Qin,et al. Stability analysis of double EWMA run-to-run control with metrology delay , 2002, Proceedings of the 2002 American Control Conference (IEEE Cat. No.CH37301).
[8] R.P. Good,et al. On the stability of MIMO EWMA run-to-run controllers with metrology delay , 2006, IEEE Transactions on Semiconductor Manufacturing.
[9] S. Adivikolanu,et al. Extensions and performance/robustness tradeoffs of the EWMA run-to-run controller by using the internal model control structure , 2000 .
[10] S. Tseng,et al. A study on a multivariate EWMA controller , 2002 .
[11] Jerry A. Stefani,et al. Advanced process control of a CVD tungsten reactor , 1996 .
[12] C.H. Yu,et al. Virtual metrology: a solution for wafer to wafer advanced process control , 2005, ISSM 2005, IEEE International Symposium on Semiconductor Manufacturing, 2005..
[13] Evanghelos Zafiriou,et al. Robust run-to-run control for semiconductor manufacturing: an internal model control approach , 1998, Proceedings of the 1998 American Control Conference. ACC (IEEE Cat. No.98CH36207).