Simulation Based Scheduling System in a Semiconductor Backend Facility
暂无分享,去创建一个
[1] S. Horn,et al. Data coupling strategies in production environments , 2005, 28th International Spring Seminar on Electronics Technology: Meeting the Challenges of Electronics Technology Progress, 2005..
[2] Qidi Wu,et al. Multiobject optimal scheduling for semiconductor manufacturing line based on satisfactory control , 2002, Proceedings of the 2002 American Control Conference (IEEE Cat. No.CH37301).
[3] Oliver Rose,et al. Accelerating products under due-date oriented dispatching rules in semiconductor manufacturing , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..
[4] Sanjay Jain,et al. Experiences with backward simulation based approach for lot release planning , 1997, WSC '97.
[5] K. Guus C. de Ruiter,et al. Simulation for recurring decisions , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[6] C. B. Besant,et al. Discrete event simulation in a semiconductor assembly area , 1997 .
[7] Gerhard W. Dueck,et al. Threshold accepting: a general purpose optimization algorithm appearing superior to simulated anneal , 1990 .
[8] S.J. Mason,et al. A scheduling heuristic for maximizing wirebonder throughput , 2004, IEEE Transactions on Electronics Packaging Manufacturing.
[9] Appa Iyer Sivakumar. Optimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system , 1999, WSC '99.
[10] Lars Mönch,et al. Improving the performance of dispatching rules in semiconductor manufacturing by iterative simulation , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..
[11] John W. Fowler,et al. Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility , 2002, Proceedings of the Winter Simulation Conference.
[12] Douglas G. Watt,et al. Integrating simulation based scheduling with MES in a semi-conductor fab , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[13] Hsi-Lo Lo,et al. Automatically form batch via real time dispatcher for furnace operation in 300 mm fab , 2004, 2004 Semiconductor Manufacturing Technology Workshop Proceedings (IEEE Cat. No.04EX846).
[14] Steven Brown,et al. Effective implementation of cycle time reduction strategies for semiconductor back-end manufacturing , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).