Reliability or Inventory? An Analysis of Performance-Based Contracts for Product Support Services

Traditional sourcing arrangements for after-sales product support have centered around physical assets. Typically, a customer would pay the supplier of maintenance services in proportion to the resources used, such as spare parts, that are needed to maintain the product. In recent years, we have witnessed the emergence of a new service contracting strategy called performance-based contracting (PBC). Under such a contractual relationship, the basis of supplier compensation is actual realized uptime of the product. In this study we build a game-theoretic model and compare the inefficiencies arising under the traditional resource-based contract (RBC) and PBC. In both cases, the customer sets the contract terms, and as a response, the supplier sets the base-stock inventory level of spares as well as invests in increasing product reliability. We find that PBC provides stronger incentives for the supplier to invest in reliability improvement, which in turn leads to savings in acquiring and holding spare product assets. Moreover, the efficiency of PBC improves if the supplier owns a larger portion of the spare assets. Our analysis advocates the view that the full benefit of a PBC strategy is achieved when suppliers are transformed into total service providers who take the ownership of physical assets.

[1]  Vipul Agrawal,et al.  Achieving Breakthrough Service Delivery Through Dynamic Asset Deployment Strategies , 2006, Interfaces.

[2]  Gérard P. Cachon Supply Chain Coordination with Contracts , 2003, Supply Chain Management.

[3]  Sang-Hyun Kim,et al.  Signaling New Product Reliability with After-Sales Service Contracts , 2015, Manag. Sci..

[4]  Sang‐Hyun Kim Incentives in Multi-Indenture Service Supply Chains , 2010 .

[5]  John A. Muckstadt,et al.  Analysis and Algorithms for Service Parts Supply Chains , 2008 .

[6]  BEST PRACTICES Setting Requirements Differently Could Reduce Weapon Systems ’ Total Ownership Costs , 2003 .

[7]  Dinesh Verma,et al.  A GOAL PROGRAMMING MODEL FOR OPTIMIZING RELIABILITY, MAINTAINABILITY AND SUPPORTABILITY UNDER PERFORMANCE BASED LOGISTICS , 2007 .

[8]  Paul R. Kleindorfer,et al.  Optimizer: IBM's Multi-Echelon Inventory System for Managing Service Logistics , 1990 .

[9]  Serguei Netessine,et al.  Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis , 2011, Manag. Sci..

[10]  Geert-Jan van Houtum,et al.  Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..

[11]  J. Michael Cummins,et al.  Incentive Contracting for National Defense: A Problem of Optimal Risk Sharing , 1977 .

[12]  Craig C. Sherbrooke,et al.  Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..

[13]  Rajesh Piplani,et al.  A study of repairable parts inventory system operating under performance-based contract , 2011, Eur. J. Oper. Res..

[14]  Paul R. Kleindorfer,et al.  Near-Optimal Service Constrained Stocking Policies for Spare Parts , 1989, Oper. Res..

[15]  Alan Scheller-Wolf,et al.  Redundancy Optimization for Critical Components in High-Availability Technical Systems , 2013, Oper. Res..

[16]  Robert Gibbons,et al.  Incentives Between Firms (and Within) , 2005, Manag. Sci..

[17]  Craig C. Sherbrooke,et al.  Optimal Inventory Modeling of Systems: Multi-Echelon Techniques (INTL SERIES IN OPERATIONS RESEARCH & MANAGEMENT SCIENCE) , 1992 .

[18]  Keebom Kang,et al.  Decision Support Models for Valuing Improvements in Component Reliability and Maintenance , 2010 .

[19]  Serguei Netessine,et al.  Contracting for Infrequent Restoration and Recovery of Mission-Critical Systems , 2010, Manag. Sci..

[20]  W. Rogerson Economic Incentives and the Defense Procurement Process , 1994 .

[21]  Nitish Jain,et al.  Optimal Contracts for Outsourcing of Repair and Restoration Services , 2013, Oper. Res..

[22]  Paul R. Milgrom,et al.  Multitask Principal–Agent Analyses: Incentive Contracts, Asset Ownership, and Job Design , 1991 .

[23]  Serguei Netessine,et al.  Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..