Non-destructive Assessment and Health Monitoring of Railway Infrastructures
暂无分享,去创建一个
Alessandro Calvi | Fabio Tosti | Luca Bianchini Ciampoli | Salih Serkan Artagan | Fabrizio D’Amico | F. Tosti | F. D’Amico | A. Calvi | S. S. Artagan | L. Bianchini Ciampoli
[1] S. Fontul,et al. GPR Laboratory Tests For Railways Materials Dielectric Properties Assessment , 2014, Remote. Sens..
[2] Raúl Mínguez Maturana,et al. Preventive Maintenance of Railway Infrastructures using GPR – Ground Penetrating Radar , 2011 .
[3] Iman Arasteh Khouy. Cost-effective maintenance of railway track geometry: a shift from safety limits to maintenance limits , 2013 .
[4] Fan Peng,et al. Scheduling of track inspection and maintenance activities in railroad networks , 2011 .
[5] Antti Nurmikolu,et al. Key aspects on the behaviour of the ballast and substructure of a modern railway track: research-based practical observations in Finland , 2012 .
[6] Imad L. Al-Qadi,et al. Railroad Ballast Fouling Detection Using Ground Penetrating Radar - A New Approach Based on Scattering from Voids , 2006 .
[7] Erol Tutumluer,et al. Railway Ballast Permeability and Cleaning Considerations , 2017 .
[8] María de la Vega Pérez Gracia,et al. Civil Engineering Applications of Ground Penetrating Radar , 2015 .
[9] A. Neal. Ground-penetrating radar and its use in sedimentology: principles, problems and progress , 2004 .
[10] Alessandro Calvi,et al. An investigation into the railway ballast dielectric properties using different GPR antennas and frequency systems , 2018 .
[11] Zhenwei Guo,et al. Detection of Permafrost Subgrade Using GPR: A Case Examination on Qinghai-Tibet Plateau , 2015 .
[12] Carlo Atzeni,et al. High-speed CW step-frequency coherent radar for dynamic monitoring of civil engineering structures , 2004 .
[13] Peter Trampus. NDT CHALLENGES AND RESPONSES ‒ AN OVERVIEW , 2016 .
[14] Alessandro Calvi,et al. Railway ballast condition assessment using ground-penetrating radar – An experimental, numerical simulation and modelling development , 2017 .
[15] Fuk K. Li,et al. Synthetic aperture radar interferometry , 2000, Proceedings of the IEEE.
[16] D. Connolly,et al. Study of railway track stiffness modification by polyurethane reinforcement of the ballast , 2014 .
[17] Takashi Izumi,et al. Obstacle Recognition from Forward View Images from Trams , 2008 .
[18] Imad L. Al-Qadi,et al. Data Analysis Techniques for GPR Used for Assessing Railroad Ballast in High Radio-Frequency Environment , 2010 .
[19] C. Esveld. Modern railway track , 1989 .
[20] Michael Forde,et al. The application of time domain ground penetrating radar to evaluate railway track ballast , 1999 .
[21] Uday Kumar,et al. Cost-Based Optimization of Track Geometry Inspection , 2016 .
[22] Satish Chandra,et al. Railway Engineering , 2008 .
[23] P Jackson,et al. Imaging attributes of railway track formation and ballast using ground probing radar , 1999 .
[24] Frank Klawonn,et al. Multiobjective optimization for railway maintenance plans , 2018 .
[25] Hwa-Yaw Tam,et al. Real-Time Train Wheel Condition Monitoring by Fiber Bragg Grating Sensors , 2011, Int. J. Distributed Sens. Networks.
[26] Vittorio M. N. Passaro,et al. Fibre Bragg Grating Based Strain Sensors: Review of Technology and Applications , 2018, Sensors.
[27] J. J. Kalker,et al. Rail quality and maintenance for modern railway operation : International Conference on Rail Quality and Maintenance for Modern Railway Operation, Delft, June 1992 , 1993 .
[28] Tat-Hean Gan,et al. An Intelligent Methodology for Railways Monitoring Using Ultrasonic Guided Waves , 2014 .
[29] Wei Pan,et al. Fiber Sensors for Strain Measurements and Axle Counting in High-Speed Railway Applications , 2011, IEEE Sensors Journal.
[30] Konstantinos Tzanakakis,et al. The Railway Track and Its Long Term Behaviour: A Handbook for a Railway Track of High Quality , 2013 .
[31] Imad L. Al-Qadi,et al. Time-Frequency Approach for Ground Penetrating Radar Data Analysis to Assess Railroad Ballast Condition , 2008 .
[32] Yongzhao Zhan,et al. Maximum Neighborhood Margin Discriminant Projection for Classification , 2014, TheScientificWorldJournal.
[33] Michael Forde,et al. Issues over high-speed non-invasive monitoring of railway trackbed , 2004 .
[34] Buddhima Indraratna,et al. An Evaluation of Fouled Ballast in a Laboratory Model Track Using Ground Penetrating Radar , 2010 .
[35] Alessandro Calvi,et al. A GPR Spectral-Based Processing Method for Minimisation of Concrete Sleepers Effects in Railway Ballast Investigations , 2018, 2018 41st International Conference on Telecommunications and Signal Processing (TSP).
[36] Massimiliano Pieraccini,et al. Monitoring of Civil Infrastructures by Interferometric Radar: A Review , 2013, TheScientificWorldJournal.
[37] Stuart Robson,et al. Extracting Rail Track Geometry from Static Terrestrial Laser Scans for Monitoring Purposes , 2014 .
[38] X. Lucas Travassos,et al. Ground Penetrating Radar , 2008 .
[39] P. Anbazhagan,et al. Model track studies on fouled ballast using ground penetrating radar and multichannel analysis of surface wave , 2011 .
[40] T Saarenketo,et al. USING GPR ON RAILWAYS TO IDENTIFY FROST SUSCEPTIBLE AREAS , 2003 .
[41] Michele Crosetto,et al. Displacement monitoring and modelling of a high-speed railway bridge using C-band Sentinel-1 data , 2017 .
[42] J. Hart,et al. Field Imaging Based Assessment of In-Service Ballast Condition Authors , 2016 .
[43] N. Pfeifer,et al. Laser scanning – principles and applications , 2007 .
[44] Fabrizio D'Amico,et al. A spectral analysis of ground-penetrating radar data for the assessment of the railway ballast geometric properties , 2017 .
[45] Du Panfeng. Processing GPR Detection Data of Railway Subgrade , 2008 .
[46] Diego Galar,et al. Context Awareness And Railway Maintenance , 2014 .
[47] Abdesselam Bouzerdoum,et al. Automatic Classification of Ground-Penetrating-Radar Signals for Railway-Ballast Assessment , 2011, IEEE Transactions on Geoscience and Remote Sensing.
[48] R. Malar. Detection of Cracks and Missing Fasteners in Railway lines Using Structure Topic Model , 2015 .
[49] Michael Forde,et al. Electromagnetic properties of railway ballast , 2001 .
[50] Sophie Geraads,et al. Applying a wavenumber notch filter to remove interferences caused by railway sleepers from a GPR section , 2002, International Conference on Ground Penetrating Radar.
[51] Takashi Izumi,et al. Obstacle Recognition From Forward ViewImages From Trams , 2010 .
[52] Valery Naranjo,et al. Axlebox accelerations: Their acquisition and time–frequency characterisation for railway track monitoring purposes , 2016 .
[53] Salih Serkan Artagan. Use of Ground-Penetrating Radar in Condition Assesment of Railway Ballast , 2018 .
[54] M. Moretti,et al. ARCHIMEDE - the first European diagnostic train for global monitoring of railway infrastructure , 2004, IEEE Intelligent Vehicles Symposium, 2004.
[55] Stefano Mariani,et al. Noncontact ultrasonic guided wave inspection of rails , 2013 .
[56] Hamed Faghihi Kashani,et al. Evaluating the Influence of Breakdown Fouling and Moisture Content on Mechanical and Electromagnetic Properties of Ballasted Railroad Track , 2017 .
[57] P. Anbazhagan,et al. Identification of type and degree of railway ballast fouling using ground coupled GPR antennas , 2016 .
[58] Ashutosh Tiwari,et al. A SOFTWARE ARCHITECTURE FOR AUTONOMOUS MAINTENANCE SCHEDULING: SCENARIOS FOR UK AND EUROPEAN RAIL , 2017 .
[59] Suvi Santa-aho,et al. Automated Ultrasound-based Inspection of Rails: Review , 2017 .
[60] Johannes Hugenschmidt,et al. Railway track inspection using GPR , 2000 .
[61] Alessandro Calvi,et al. Efficient practices in railway ballast maintenance and quality assessment using GPR , 2017 .
[62] Vassilios A. Profillidis,et al. Railway management and engineering , 2017 .
[63] David Carpenter,et al. ENHANCEMENT OF THE GPR METHOD OF RAILWAY TRACKBED INVESTIGATION BY THE INSTALLATION OF RADAR DETECTABLE GEOSYNTHETICS , 2004 .
[64] Per Hokstad,et al. RAMS Management of Railway Tracks , 2008 .
[65] P. Loveday,et al. Monitoring of Rail Track Using Guided Wave Ultrasound , 2016 .
[66] Qingquan Li,et al. A 3D Laser Profiling System for Rail Surface Defect Detection , 2017, Sensors.
[67] Simona Fontul,et al. Railway Track Condition Assessment at Network Level by Frequency Domain Analysis of GPR Data , 2018, Remote. Sens..
[68] Belén Riveiro,et al. Non-Destructive Techniques for the Evaluation of Structures and Infrastructure , 2016 .
[69] Pekka Eskelinen,et al. Civil Engineering Applications of Ground Penetrating Radar in Finland , 2014 .
[70] Ram M. Narayanan,et al. RAILROAD TRACK MODULUS ESTIMATION USING GROUND PENETRATING RADAR MEASUREMENTS , 2002 .
[71] Timo Saarenketo,et al. Electrical properties of road materials and subgrade soils and the use of ground penetrating radar in traffic infrastructure surveys , 2006 .
[72] Mohd Rapik Saat,et al. Optimizing Ultrasonic Rail Defect Inspection to Improve Transportation Safety and Efficiency , 2014 .
[73] Tomas Lidén. Railway Infrastructure Maintenance - A Survey of Planning Problems and Conducted Research , 2015 .
[74] Ladislav Routil,et al. Analysis of GPR and FWD Data Dependency Based on Road Test Field Surveys , 2019 .
[75] Hitoshi Tsunashima,et al. Fault Detection of Railway Track by Multi-Resolution Analysis , 2006 .
[76] Sakdirat Kaewunruen,et al. Optimisation of schedules for the inspection of railway tracks , 2018 .
[77] T. Kojima,et al. Fault Detection Of Railway Track ByMulti-resolution Analysis , 2010 .
[78] Paul Weston,et al. Measuring the deflection of a sequence of sleepers at a transition zone , 2015 .
[79] Arnold D. Kerr. On the determination of the rail support modulus k , 2000 .
[80] Tong Sun,et al. Strain Measurement on a Rail Bridge Loaded to Failure Using a Fiber Bragg Grating-Based Distributed Sensor System , 2008, IEEE Sensors Journal.
[81] Yasuto Fukada,et al. The Mechanism of Railway Tracks , 2000 .
[82] Z. Khakiev,et al. GPR determination of physical parameters of railway structural layers , 2014 .
[83] Imad L. Al-Qadi,et al. Optimization of antenna configuration in multiple-frequency ground penetrating radar system for railroad substructure assessment , 2010 .
[84] J. N. Varandas,et al. Dynamic behaviour of railway tracks on transitions zones , 2011 .
[85] X. W. Ye,et al. Structural Health Monitoring of Civil Infrastructure Using Optical Fiber Sensing Technology: A Comprehensive Review , 2014, TheScientificWorldJournal.
[86] W. Powrie,et al. Dynamic Stress Analysis of a Ballasted Railway Track Bed during Train Passage , 2009 .
[87] Li Zhi Du,et al. Study on Ground Penetrating Radar in Detecting of Zero-Temperature Boundary under the Railway Bed , 2011 .
[88] Imad L. Al-Qadi,et al. Scattering analysis of ground-penetrating radar data to quantify railroad ballast contamination , 2008 .
[89] Guido Manacorda,et al. Customized GPR system for railroad track verification , 2002, International Conference on Ground Penetrating Radar.
[90] Qing Zhang,et al. Characterisation of ballast materials in trackbed using ground penetrating Radar: Part 1 , 2011 .
[91] F. Tosti,et al. A comparative investigation of the effects of concrete sleepers on the GPR signal for the assessment of railway ballast , 2018, 2018 17th International Conference on Ground Penetrating Radar (GPR).
[92] Robert Paul,et al. Non-destructive evaluation of railway trackbed ballast , 2011 .
[93] Gary R. Olhoeft,et al. ASSESSMENT OF RAILWAY TRACK SUBSTRUCTURE CONDITION USING GROUND PENETRATING RADAR , 2003 .
[94] A. Tolooiyan,et al. Geophysical and geotechnical assessment of a railway embankment failure , 2011 .
[95] Damian Beben. Application of the interferometric radar for dynamic tests of corrugated steel plate (CSP) culvert , 2011 .
[96] António Barrias,et al. A Review of Distributed Optical Fiber Sensors for Civil Engineering Applications , 2016, Sensors.
[97] Harry M. Jol,et al. Ground penetrating radar : theory and applications , 2009 .
[98] Ramon F. Hanssen,et al. Nationwide Railway Monitoring Using Satellite SAR Interferometry , 2017, IEEE Journal of Selected Topics in Applied Earth Observations and Remote Sensing.
[99] S. Fontul,et al. Close Range Photogrammetry: Fundamentals, Principles and Applications in Structures , 2016 .
[100] Ettore Stella,et al. Potential Dangerous Object Detection on Railway Ballast using Digital Image Processing , 2006 .
[101] S. Shihab,et al. Time-frequency characteristics of ground penetrating radar reflections from railway ballast and plant , 2002, 7th IEEE High Frequency Postgraduate Student Colloquium.
[102] D. Aggelis,et al. Improved crack monitoring in structural concrete by combined acoustic emission and digital image correlation techniques , 2016 .
[103] Andreas F. Molisch,et al. High-Speed Railway Communications: From GSM-R to LTE-R , 2016, IEEE Vehicular Technology Magazine.
[104] Steven R. Doctor,et al. Damage Assessment Technologies for Prognostics and Proactive Management of Materials Degradation , 2009 .
[105] Davide Anguita,et al. Condition Based Maintenance in Railway Transportation Systems Based on Big Data Streaming Analysis , 2015, INNS Conference on Big Data.
[106] Roar Nålsund,et al. Railway Ballast Characteristics, Selection Criteria and Performance , 2014 .
[107] Yu Cui,et al. Data-driven optimization of railway maintenance for track geometry , 2018 .
[108] A. Rodriguez-Barrios,et al. Real-Time Monitoring of Railway Traffic Using Fiber Bragg Grating Sensors , 2012, IEEE Sensors Journal.
[109] Christos Pyrgidis,et al. Railway Transportation Systems: Design, Construction and Operation , 2016 .
[110] F. Tosti,et al. An Investigation into the railway ballast grading using GPR and image analysis , 2017, 2017 9th International Workshop on Advanced Ground Penetrating Radar (IWAGPR).
[111] William Powrie,et al. Determination of Dynamic Track Modulus from Measurement of Track Velocity during Train Passage , 2009 .
[112] R. Hellmann,et al. Georadar-model and in-situ investigations for inspection of railway tracks , 1994 .
[113] M Ph Papaelias,et al. A review on non-destructive evaluation of rails: State-of-the-art and future development , 2008 .
[114] Ernest T. Selig,et al. Railway track condition indicators from ground penetrating radar , 2003 .
[115] Paulo B. Lourenço,et al. Assessment of layer thickness and uniformity in railway embankments with Ground Penetrating Radar , 2008 .
[116] Uday Kumar,et al. Data-driven model for maintenance decision support: A case study of railway signalling systems , 2016 .
[117] Nic James,et al. Relationship between Repeated Sprint Ability and Aerobic Capacity in Professional Soccer Players , 2013, TheScientificWorldJournal.
[118] Antonia Moropoulou,et al. Methodology for the monitoring, control and warning of defects for preventive maintenance of rails , 2006 .
[119] Charles P. Oden,et al. MODEL TRACK STUDIES BY GROUND PENETRATING RADAR (GPR) ON BALLAST WITH DIFFERENT FOULING AND GEOTECHNICAL PROPERTIES , 2015 .
[120] R. E. Schramm,et al. NONCONTACT ULTRASONIC INSPECTION OF TRAIN RAILS FOR STRESS , 1993 .
[121] Hitoshi Tsunashima,et al. Condition Monitoring of Railway Track Using In-Service Vehicle , 2010 .
[122] Eric Berggren,et al. Railway Track Stiffness Dynamic Measurements and Evaluation for Efficient Maintenance , 2009 .
[123] Garry Berkovic,et al. Optical methods for distance and displacement measurements , 2012 .
[124] Ettore Stella,et al. Potential Dangerous Object Detection OnRailway Ballast Using Digital Image Processing , 2010 .
[125] Wang Meng. Algorithm for Suppressing Sleeper Interferences in Railway Subgrade GPR Signals , 2013 .
[126] Ernest T. Selig,et al. Track Geotechnology and Substructure Management , 1995 .
[127] R.M. da Costa Marques Pimentel,et al. Hybrid Fiber-Optic/Electrical Measurement System for Characterization of Railway Traffic and Its Effects on a Short Span Bridge , 2008, IEEE Sensors Journal.
[128] J Barta. A methodology for geophysical investigation of track defects , 2010 .
[129] Mostafa Arastounia,et al. Automated Recognition of Railroad Infrastructure in Rural Areas from LIDAR Data , 2015, Remote. Sens..
[130] Imad L. Al-Qadi,et al. Railroad Ballast Evaluation Using Ground-Penetrating Radar , 2010 .
[131] Laura Montalbán,et al. Determination of Rail Vertical Profile through Inertial Methods , 2011 .
[132] P. J. Grabe,et al. Characterising railway substructure layers for rehabilitation design , 2012 .
[133] Florian Auer. Multi-function Track Recording Cars , 2013 .
[134] Michael Burrow,et al. Deflectometer-based analysis of ballasted railway tracks , 2007 .
[135] Bhanitiz Aursudkij,et al. A Laboratory Study of Railway Ballast Behaviour: Under Traffic Loading and Tamping Maintenance , 2009 .
[136] Stjepan Lakusic,et al. Optimisation of railway track maintenance and renewal works by genetic algorithms , 2017 .
[137] F. Tosti,et al. Laboratory investigations for the electromagnetic characterization of railway ballast through GPR , 2016, 2016 16th International Conference on Ground Penetrating Radar (GPR).
[138] Joaquim Gabriel,et al. Dynamic monitoring of railway track displacement using an optical system , 2015 .
[139] Rong Chen,et al. Overview and outlook on railway track stiffness measurement , 2016 .
[140] Annan. Ground Penetrating Radar — Coming of Age at Last ! ! , 1997 .