Constructing lining simultaneously with excavating tunnel, and lining constructing method using thereof
暂无分享,去创建一个
The invention is capable parallel lining construction apparatus and relates to a construction method using the same lining, in particular is installed in the excavated tunnel, the internal construction of the mobile equipment the space portion is arranged to be imposed frame of the tunnel excavation; Along the installed base at the bottom of the excavated tunnel on both sides to move a portion which moves the frame and precast lining is mounted; And the pre-cast linings mounted on the mobile unit, wherein the moves made by excavation of a tunnel built as part of the construction precast lining. Such a present according to the invention is moved along the frame portion tunnel after loading the precast lining to the frame portion outside and then constructed on the surface excavation precast lining using a load at that location, and drilling through the inner frame section Equipment of excavation and lining construction work by a movable relative can shorten the construction period to ensure progress at the same time.