HIGH INTENSITY DRIVER ACCELERATORS FOR EURISOL
暂无分享,去创建一个
This paper describes briefly the result of the work done by the Driver Accelerator Task Group of the EURISOL RTD project (1). Accelerator experts from the laboratories participating in this study, namely CEA- Saclay, CERN, GANIL, INFN-Legnaro, IPN-Orsay, have elaborated different technical solutions during the period 2000-2001 (2), following the recommendations for specifications of the EURISOL Steering Committee. The main conclusion of the study is that the EURISOL base- line driver accelerator should be a 1-GeV, 5-MW CW proton facility, with a possible upgrade to 2 GeV. A cheaper "back-up" solution, based on a high-intensity electron driver for photo-fission, is also discussed.
[1] T. Junquera,et al. 700 MHZ SUPERCONDUCTING PROTON CAVITIES DEVELOPMENT AND FIRST TESTS IN THE HORIZONTAL CRYOSTAT "CRYHOLAB" , 2002 .
[2] P. Pierini,et al. STATUS OF THE HIGH CURRENT PROTON ACCELERATOR FOR THE TRASCO PROGRAM , 2002 .
[3] H. Safa,et al. Superconducting Proton Linac for Waste Transmutation , 1999 .