Maintenance backlog for improving integrated planning

Purpose The purpose of this paper is to develop a novel model for maintenance backlog (MB) of physical assets and structure it in a framework for integrated planning (IPL). Design/methodology/approach Reliability theory principles for modelling MB are used. Furthermore, to structure a framework for IPL, literature study combined with earlier case studies is used. Findings The framework for IPL facilitates the model of MB. In addition to providing real-time diagnosis indicators, MB is regarded as valuable information for decision support in IPL. Originality/value Development of MB applied to IPL.

[1]  Graham K. Rand Critical chain: the theory of constraints applied to project management , 2000 .

[2]  J. Christopher Beck,et al.  Integrated maintenance planning and production scheduling with Markovian deteriorating machine conditions , 2014 .

[3]  Doc Palmer,et al.  Maintenance Planning and Scheduling Handbook , 1999 .

[4]  Snorre Sklet,et al.  Evaluation of the Risk OMT model for maintenance work on major offshore process equipment , 2012 .

[5]  Harald Rødseth,et al.  Profit loss indicator: a novel maintenance indicator applied for integrated planning , 2015 .

[6]  E. Alexander If Planning isn't Everything, Maybe it's Something , 1981 .

[7]  Knut Øien,et al.  Vedlikeholdets plass i barrierestyringen , 2014 .

[8]  Abdur Rahim,et al.  Integrated models in production planning and scheduling, maintenance and quality: a review , 2012 .

[9]  Jun Ni,et al.  Joint Production and Preventive Maintenance Strategy for Manufacturing Systems With Stochastic Demand , 2013 .

[10]  Ali Gharbi,et al.  Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality , 2013 .

[11]  U. Al-Turki A framework for strategic planning in maintenance , 2011 .

[12]  Felix T.S. Chan,et al.  Decision-making on multi-mould maintenance in production scheduling , 2014 .

[13]  Harald Rødseth,et al.  The Importance of Asset Management and Hidden Factory for Integrated Planning , 2014 .

[14]  Willy Herroelen,et al.  On the merits and pitfalls of critical chain scheduling , 2000 .

[15]  T. A. Thorstensen,et al.  Lifetime profit modelling of ageing systems utilising information about technical condition , 2008 .

[16]  Zhilong Chen,et al.  The Study About the Integrated Planning Theory of Surface and Underground Urban Space , 2011 .

[17]  A. Hopland Can game theory explain poor maintenance of regional government facilities , 2015 .

[18]  Brian Hackett,et al.  Beyond Knowledge Management: New Ways to Work and Learn , 2000 .

[19]  Yu Bai,et al.  Field-Wide Integrated Planning in a Complex and Remote Operational Environment: Reflections Based on an Industrial Case Study , 2012 .

[20]  Premaratne Samaranayake,et al.  Aircraft maintenance planning and scheduling : an integrated framework , 2012 .

[21]  Siana Halim,et al.  Reliability Centered Maintenance di PT. X , 2015 .

[22]  Yi Deng,et al.  Dynamic Integrated Planning System Based on Landscape Urbanism: An Approach of Sustainable Urban Landscape Planning , 2011 .

[23]  Kagermann Henning Recommendations for implementing the strategic initiative INDUSTRIE 4.0 , 2013 .

[24]  Marvin Rausand,et al.  Reliability centered maintenance , 1998 .

[25]  Shin Ta Liu,et al.  Project Management: A Systems Approach To Planning, Scheduling and Controlling (Book) , 2004 .

[26]  Kyung S. Park,et al.  Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System , 1991 .

[27]  Jan Erik Vinnem,et al.  Risk modelling of maintenance work on major process equipment on offshore petroleum installations , 2012 .

[28]  Thomas Welsh Archibald,et al.  Safety, Reliability and Risk Analysis: Beyond the Horizon , 2014 .

[29]  Ronald Reagan,et al.  Public papers of the presidents of the United States , 1982 .

[30]  Kristin Halvorsen,et al.  Improved Coordination with Integrated Planning: Organisational Capabilities , 2010 .

[31]  Marvin Rausand,et al.  Barrier management in the offshore oil and gas industry , 2015 .

[32]  Rob Sherwood,et al.  Integrated planning and execution for autonomous spacecraft , 1999, 1999 IEEE Aerospace Conference. Proceedings (Cat. No.99TH8403).

[33]  Daryl Powell,et al.  ICT-Enabled Integrated Operations: Towards a Framework for the Integration of Manufacturing- and Maintenance Planning and Control , 2013, APMS.

[34]  Ortwin Renn,et al.  A New Approach to Risk Evaluation and Management: Risk‐Based, Precaution‐Based, and Discourse‐Based Strategies 1 , 2002, Risk analysis : an official publication of the Society for Risk Analysis.

[35]  Tongdan Jin,et al.  Joint production and maintenance planning with machine deterioration and random yield , 2014 .

[36]  Eliyahu M. Goldratt,et al.  What is this thing called theory of constraints and how should it be implemented , 1990 .

[37]  Towards a holistic approach for barrier management in the petroleum industry , 2015 .

[38]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[39]  Michael Burrow,et al.  Strategies to clear road maintenance backlog , 2012 .

[40]  Erik Rolland,et al.  How to Implement Multidisciplinary Work Processes in the Oil Industry: A Statoil Case , 2013 .

[41]  Rommert Dekker,et al.  Applications of maintenance optimization models : a review and analysis , 1996 .

[42]  Maurizio Bevilacqua,et al.  Critical chain and risk analysis applied to high-risk industry maintenance: A case study , 2009 .

[43]  Abdul Raouf,et al.  Planning and Control of Maintenance Systems , 2015 .

[45]  Yu Bai,et al.  Evaluating and optimising integrated planning in complex production assets: learnings from offshore petroleum industry , 2010 .

[46]  András Kovács,et al.  Novel Models and Algorithms for Integrated Production Planning and Scheduling , 2005 .

[47]  H Rødseth Maintenance optimisation for integrated planning , 2013 .

[48]  P. Drucker,et al.  管理的实践=The practice of management , 1954 .

[49]  Lorraine Daniels Planning and Control of Maintenance Systems: Modeling and Analysis , 2000 .

[50]  Mazhar Ali Khan Malik,et al.  Reliable Preventive Maintenance Scheduling , 1979 .

[51]  Gwo-Liang Liao,et al.  Joint production and maintenance strategy for economic production quantity model with imperfect production processes , 2013, J. Intell. Manuf..

[52]  John H. Blackstone,et al.  The evolution of a management philosophy: The theory of constraints , 2007 .

[53]  H. Zied,et al.  Joint optimisation of maintenance and production policies with subcontracting and product returns , 2014 .

[54]  Robert C. Newbold,et al.  Project Management in the Fast Lane: Applying the Theory of Constraints , 1998 .