Improving train service reliability by applying an effective timetable robustness strategy
暂无分享,去创建一个
[1] Paolo Toth,et al. Nominal and robust train timetabling problems , 2012, Eur. J. Oper. Res..
[2] C. Zaroliagis,et al. An experimental study of bicriteria models for robust timetabling , 2013 .
[3] Anders Peterson. Towards a robust traffic timetable for the Swedish Southern Mainline , 2012 .
[4] Sara Gestrelius,et al. On the Delivery Robustness of Train Timetables with Respect to Production Replanning Possibilities , 2012 .
[5] Miguel A. Salido,et al. Robustness for a single railway line: Analytical and simulation methods , 2012, Expert Syst. Appl..
[6] Jan A. Persson,et al. N-tracked railway traffic re-scheduling during disturbances , 2007 .
[7] Leo G. Kroon,et al. Reliability and Heterogeneity of Railway Services , 2006, Eur. J. Oper. Res..
[8] Erhan Kozan,et al. Performance profiling for predictive train schedules , 2014, J. Rail Transp. Plan. Manag..
[9] L. Ingolotti,et al. Robustness in railway transportation scheduling , 2008, 2008 7th World Congress on Intelligent Control and Automation.
[10] M. Grimm. The analysis of congested infrastructure and capacity utilisation at Trafikverket , 2012 .
[11] Francesco Corman,et al. Evaluating Disturbance Robustness of Railway Schedules , 2014, J. Intell. Transp. Syst..
[12] Anders Lindfeldt. Congested railways : influence of infrastructure and timetable properties on delay propagation , 2012 .
[13] Nebojsa J. Bojovic,et al. Optimal allocation of buffer times to increase train schedule robustness , 2017, Eur. J. Oper. Res..
[14] Seyed Jafar Sadjadi,et al. Robust Train Timetabling Problem: Mathematical Model and Branch and Bound Algorithm , 2012, IEEE Transactions on Intelligent Transportation Systems.
[15] Raffaele Pesenti,et al. Automatic generation of railway timetables based on a mesoscopic infrastructure model , 2014, J. Rail Transp. Plan. Manag..
[16] Anders Peterson,et al. Robustness Improvements in a Train Timetable with Travel Time Dependent Minimum Headways , 2015 .
[17] Malachy Carey,et al. Stochastic approximation to the effects of headways on knock-on delays of trains , 1994 .
[18] Thorsten Büker,et al. Stochastic modelling of delay propagation in large networks , 2012, J. Rail Transp. Plan. Manag..
[19] Dirk Cattrysse,et al. Robust railway station planning: An interaction between routing, timetabling and platforming , 2013, J. Rail Transp. Plan. Manag..
[20] Rommert Dekker,et al. Stochastic Improvement of Cyclic Railway Timetables , 2006 .
[21] Rob M.P. Goverde,et al. Railway Timetable Stability Analysis Using Max-plus System Theory , 2007 .
[22] Nils O.E. Olsson,et al. Influencing factors on train punctuality—results from some Norwegian studies , 2004 .
[23] Matteo Fischetti,et al. A Lagrangian Heuristic for Robustness, with an Application to Train Timetabling , 2012, Transp. Sci..
[24] Johanna Törnquist Krasemann. Design of an Effective Algorithm for Fast Response to the Rescheduling of Railway Traffic During Disturbances , 2012 .
[25] Dennis Huisman,et al. Optimisation Models for Railway Timetabling , 2014 .
[26] Matteo Fischetti,et al. Fast Approaches to Improve the Robustness of a Railway Timetable , 2009, Transp. Sci..
[27] Francesco Corman,et al. Assessment of Advanced Dispatching Measures for Recovering Disrupted Railway Traffic Situations , 2012 .
[28] Sara Gestrelius,et al. Towards shorter lead times in railway timetabling in Sweden , 2013, 16th International IEEE Conference on Intelligent Transportation Systems (ITSC 2013).
[29] Baoming Han,et al. Research on the optimization of train headway for the high-speed railway network , 2011, ICSSSM11.
[30] Johanna Törnquist Krasemann,et al. Quantifying railway timetable robustness in critical points , 2013, J. Rail Transp. Plan. Manag..