For the IGLC 12 Conference the authors reported the results of implementing Last PlannerTM methods with a large UK contracting company. The projects studied demonstrated some success but also some cultural, organizational and systemic barriers to its effective implementation. Alarcon and Conte’s White Paper for the IGLC11 conference discussed these issues and invited researchers to consider them. In response, the authors have reflected upon and critically re-analysed the research as a means to refocus their future work in implementing Lean Construction methods in UK construction. Based on a review of the literature on construction culture we have identified theoretical factors that, together with Alarcon and Conte's list of critical organizational elements, provide a framework against which the results of the research have been considered. We conclude that the implementation of Last Planner was hindered by not fully considering cultural, organizational and systemic problems and by failing to recognize how deepseated these problems could be. We intend, in future projects, to take a more considered, and wider approach to Lean Construction (possibly using the LCI’s Lean Project Delivery System) and to focus our attention upon construction ventures where efforts at culture change have already started - in particular, where strategic partnering arrangements are in place.
[1]
Eric Johansen,et al.
An experience of introducing last planner into a UK construction project
,
2003
.
[2]
A. Wild,et al.
The unmanageability of construction and the theoretical psycho‐social dynamics of projects
,
2002
.
[3]
Brychan Thomas,et al.
HARMONIZATION BETWEEN MAIN CONTRACTORS AND SUBCONTRACTORS: A PREREQUISITE FOR LEAN CONSTRUCTION?
,
2002
.
[4]
Eric Johansen.
The application of a pilot pull planning system to construction projects
,
2002
.
[5]
Gregory A. Howell,et al.
WHAT IS LEAN CONSTRUCTION - 1999
,
1999
.
[6]
Alan Wild,et al.
Re‐interpreting the Building Industry Communications Research Project
,
2004
.
[7]
Gregory A. Howell,et al.
An Update on Last Planner
,
2003
.
[8]
Stuart D. Green.
THE HUMAN RESOURCE MANAGEMENT IMPLICATIONS OF LEAN CONSTRUCTION: CRITICAL PERSPECTIVES AND CONCEPTUAL CHASMS
,
2002
.
[9]
David Seymour,et al.
Getting UK Construction People to Think Lean - Where to Start? A Case Study
,
1998
.