Integrative Cycle Scheduling Approach for a Capacitated Flexible Assembly System
暂无分享,去创建一个
[1] Loren Paul Rees,et al. Solving the Economic Lot‐Scheduling Problem Using the Method of Prime Subperiods , 1989 .
[2] W. Hsu. On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine , 1983 .
[3] S. Selcuk Erenguc,et al. On the Joint Lot-Sizing Problem with Zero Setup Costs , 1989 .
[4] Samuel G. Davis. Scheduling Economic Lot Size Production Runs , 1990 .
[5] G. Bitran,et al. Computational Complexity of the Capacitated Lot Size Problem , 1982 .
[6] Jack D. Rogers. A Computational Approach to the Economic Lot Scheduling Problem , 1958 .
[7] Peter A. Pinto,et al. Concepts, Theory, and Techniques A JOINT LOT-SIZING RULE FOR FIXED LABOR-COST SITUATIONS , 1986 .
[8] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[9] L. V. Wassenhove,et al. Some extensions of the discrete lotsizing and scheduling problem , 1991 .
[10] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .
[11] William J. Zimmer,et al. Tables of Sample Sizes in the Analysis of Variance , 1970 .
[12] Stanley Zionts,et al. Multi-Item Scheduling by Benders' Decomposition , 1987 .
[13] Alan S. Manne,et al. Programming of Economic Lot Sizes , 1958 .
[14] William W. Trigeiro,et al. Capacitated lot sizing with setup times , 1989 .
[15] B. P. Dzielinski,et al. Optimal Programming of Lot Sizes, Inventory and Labor Allocations , 1965 .
[16] Leon S. Lasdon,et al. An Efficient Algorithm for Multi-Item Scheduling , 1971, Oper. Res..
[17] Luk N. Van Wassenhove,et al. Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review , 1988 .
[18] E. Newson. Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources , 1975 .
[19] Lloyd A. Swanson,et al. A lot sizing and sequencing algorithm for dynamic demands upon a single facility , 1982 .
[20] L. Ritzman,et al. A cyclical scheduling heuristic for lot sizing with capacity constraints , 1984 .
[21] C L Doll,et al. AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .
[22] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .
[23] Vincent A. Mabert,et al. Cyclical schedules for capacitated lot sizing with dynamic demands , 1991 .