Positioning and tracking construction vehicles in highly dense urban areas and building construction sites
暂无分享,去创建一个
Wu Chen | Jianye Liu | Hoi-Ching Lam | Ming Lu | Xuesong Shen | Jianye Liu | Xuesong Shen | Wu Chen | M. Lu | H. Lam
[1] Edward J. Jaselskis,et al. Implementing Radio Frequency Identification in the Construction Process , 2003 .
[2] Liang Yong,et al. Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency , 2005 .
[3] Daniel W. Engels,et al. Radio Frequency Identification and the Electronic Product Code , 2001, IEEE Micro.
[4] Amr A. Oloufa,et al. A GIS-based system for tracking pavement compaction☆ , 1996 .
[5] Washington Y. Ochieng,et al. URBAN ROAD TRANSPORT NAVIGATION: PERFORMANCE OF THE GLOBAL POSITIONING SYSTEM AFTER SELECTIVE AVAILABILITY , 2002 .
[6] Govindan Kannan,et al. DEVELOPMENT OF AN EXPERIENCE DATABASE FOR TRUCK LOADING OPERATIONS , 2000 .
[7] Wu Chen,et al. Discussion of “Building Project Model Support for Automated Labor Monitoring” by R. Sacks, R. Navon, and E. Goldschmidt , 2004 .
[8] Charles T. Jahren,et al. Communications and Tracking for Construction Vehicles , 1997 .
[9] Chatschik Bisdikian,et al. An overview of the Bluetooth wireless technology , 2001, IEEE Commun. Mag..
[10] Alan Dodson,et al. Global Positioning System aided autonomous construction plant control and guidance , 1999 .
[11] David Garlan,et al. Project Aura: Toward Distraction-Free Pervasive Computing , 2002, IEEE Pervasive Comput..
[12] François Peyret,et al. High-precision application of GPS in the field of real-time equipment positioning , 2000 .
[13] Roy Want,et al. RFID Technology and Applications , 2006, IEEE Pervasive Computing.
[14] Simaan M. AbouRizk,et al. NEURAL NETWORK MODEL FOR ESTIMATING CONSTRUCTION PRODUCTIVITY , 1997 .
[15] Hsiao-Cheng Yu,et al. Challenges to Global RFID Adoption , 2006, 2006 Technology Management for the Global Future - PICMET 2006 Conference.
[16] Ming Lu,et al. HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong , 2003 .
[17] Akintola Akintoye,et al. Just-in-Time application and implementation for building material management , 1995 .
[18] Josef Hallberg,et al. Positioning with Bluetooth , 2003, 10th International Conference on Telecommunications, 2003. ICT 2003..
[19] Amr A. Oloufa,et al. Situational awareness of construction equipment using GPS, wireless and web technologies , 2003 .
[20] Rafael Sacks,et al. Building Project Model Support for Automated Labor Monitoring , 2003 .
[21] W. Ochieng,et al. An Extended Kalman Filter Algorithm for Integrating GPS and Low Cost Dead Reckoning System Data for Vehicle Performance and Emissions Monitoring , 2003 .
[22] Ming Lu,et al. Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects , 2004 .
[23] Ronie Navon,et al. Monitoring labor inputs: automated-data-collection model and enabling technologies , 2003 .