Experimental push/pull production planning and control system

Abstract We introduce an experimental push/ pull production planning and control software system which is designed as an alternative to a MRP-II system for mass manufacturing enterprises in China. It has the following distinguishing features: (1) putting the philosophy of JIT into the master production scheduling of MRP-II via the earliness/ tardiness production planning method; (2) controlling material input by push and processing/ assembly by pull; and (3) adjusting the parameters of the production line by the‘ suggestion for improvement of production line’ module. Simulation results have shown that the proposed system can achieve better planning and control performance than existing systems.

[1]  Osamu Kimura,et al.  Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .

[2]  Prabuddha De,et al.  Scheduling to minimize weighted earliness and tardiness about a common due-date , 1991, Comput. Oper. Res..

[3]  John Miltenburg,et al.  Scheduling mixed-model multi-level just-in-time production systems , 1989 .

[4]  Thom J. Hodgson,et al.  Optimal hybrid push/pull control strategies for a parallel multistage system: Part II , 1991 .

[5]  Peter O'Grady,et al.  Kanban controlled pull systems: an analytic approach , 1989 .

[6]  Arnoldo C. Hax,et al.  Production and inventory management , 1983 .

[7]  Gary D. Scudder,et al.  Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..

[8]  L. Alting,et al.  Criteria for selecting a production control philosophy , 1993 .

[9]  Y. Sugimori,et al.  Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .

[10]  Sdp Simme Douwe Flapper,et al.  Embedding JIT into MRP , 1991 .

[11]  Bhaba R. Sarker,et al.  The performance of push and pull systems: a simulation and comparative study , 1989 .

[12]  Prabuddha De,et al.  On the general solution for a class of early/tardy problems , 1993, Comput. Oper. Res..

[13]  Agostino Villa,et al.  Production management: Beyond the dichotomy between push' and pull' , 1993 .

[14]  Dingwei Wang Optimization of Control Strategies and Buffer Sizes in Discrete Manufacturing Systems , 1993 .