Experimental push/pull production planning and control system
暂无分享,去创建一个
[1] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[2] Prabuddha De,et al. Scheduling to minimize weighted earliness and tardiness about a common due-date , 1991, Comput. Oper. Res..
[3] John Miltenburg,et al. Scheduling mixed-model multi-level just-in-time production systems , 1989 .
[4] Thom J. Hodgson,et al. Optimal hybrid push/pull control strategies for a parallel multistage system: Part II , 1991 .
[5] Peter O'Grady,et al. Kanban controlled pull systems: an analytic approach , 1989 .
[6] Arnoldo C. Hax,et al. Production and inventory management , 1983 .
[7] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[8] L. Alting,et al. Criteria for selecting a production control philosophy , 1993 .
[9] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .
[10] Sdp Simme Douwe Flapper,et al. Embedding JIT into MRP , 1991 .
[11] Bhaba R. Sarker,et al. The performance of push and pull systems: a simulation and comparative study , 1989 .
[12] Prabuddha De,et al. On the general solution for a class of early/tardy problems , 1993, Comput. Oper. Res..
[13] Agostino Villa,et al. Production management: Beyond the dichotomy between push' and pull' , 1993 .
[14] Dingwei Wang. Optimization of Control Strategies and Buffer Sizes in Discrete Manufacturing Systems , 1993 .