A newsvendor-like model for harvesting operational decisions

Abstract The problem considered in this paper is an extension of classical project resource-constrained scheduling under uncertainty. The extension applies to a situation where a single operation or job can be performed by more than one resource, but each resource may be temporarily unavailable throughout the project lifecycle. The problem is to determine in advance the timing of the availability of the resources, and then, to assign the operation or job to one of the optional resources. The effect of such assignment is to maximize the benefit that can be obtained throughout the project lifecycle. The paper proposes a newsvendor-like model that supports the scheduling decision-making under uncertainty and analyzes the economic benefits of alternative scheduling decisions. A case study with a rented blueberry harvester that was required for a harvesting project exposes some interesting insights that can be implemented in small projects, or in segments of large projects.

[1]  T. M. Whitin Inventory Control and Price Theory , 1955 .

[2]  Zohar Laslo Project portfolio management: An integrated method for resource planning and scheduling to minimize planning/scheduling-dependent expenses , 2010 .

[3]  J Effrey,et al.  The Florida blueberry industry: a decade of growth. , 2004 .

[4]  Xiang Li,et al.  On lot-sizing problem in a random yield production system under loss aversion , 2016, Ann. Oper. Res..

[5]  Erik Demeulemeester,et al.  Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities , 2008, J. Sched..

[6]  Raul Poler,et al.  Models for production planning under uncertainty: A review ☆ , 2006 .

[7]  O. Ahumada,et al.  Operational model for planning the harvest and distribution of perishable agricultural products , 2011 .

[8]  Juan-Carlos Ferrer,et al.  An optimization approach for scheduling wine grape harvest operations , 2008 .

[9]  Baruch Keren,et al.  Optimal booking of machines in a virtual job-shop with stochastic processing times to minimize total machine rental and job tardiness costs , 2008 .

[10]  Stéphane Dauzère-Pérès,et al.  An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search , 1997, Ann. Oper. Res..

[11]  Baruch Keren,et al.  Production , Manufacturing and Logistics A benchmark solution for the risk-averse newsvendor problem , 2006 .

[12]  Philip Martin,et al.  The U.S. Produce Industry: Labor-Intensive Commodities in a Global Market , 2012 .

[13]  M. Khouja The single-period (news-vendor) problem: literature review and suggestions for future research , 1999 .

[14]  B. Keren The single-period inventory problem: Extension to random yield from the perspective of the supply chain , 2009 .

[15]  P. Leung,et al.  Optimal harvest time in continuous aquacultural production: The case of nonhomogeneous production cycles , 2009 .

[16]  Moritz Fleischmann,et al.  Planning stability in a product recovery system , 2001, OR Spectr..

[17]  Chuanxu Wang,et al.  Pricing for seasonal deteriorating products with price- and ramp-type time-dependent demand , 2014, Comput. Ind. Eng..

[18]  Joseph S Pliskin,et al.  Optimal timing of joint replacement using mathematical programming and stochastic programming models , 2011, Health care management science.

[19]  Fritz Gehbauer,et al.  Optimized resource allocation for emergency response after earthquake disasters , 2000 .

[20]  Baris Tan,et al.  Agricultural planning of annual plants under demand, maturation, harvest, and yield risk , 2012, Eur. J. Oper. Res..