Costly Blackouts? Measuring Productivity and Environmental Effects of Electricity Shortages
暂无分享,去创建一个
Karen Fisher-Vanden | K. Fisher-Vanden | E. Mansur | Erin T. Mansur | Qiong (Juliana) Wang | Qiong Wang
[1] P. Farquhar,et al. Gaining More by Stocking Less: A Competitive Analysis of Product Availability , 1994 .
[2] Michael Beenstock,et al. The cost of power outages in the business and public sectors in Israel: revealed preference vs. subjective valuation , 1997 .
[3] D. Rosen,et al. China Energy - A Guide for the Perplexed , 2008 .
[4] Jianping Zhao,et al. Demand-side management in China's restructured power industry : How regulation and policy can deliver demand-side management benefits to a growing economy and a changing power system , 2005 .
[5] AN EFFICIENCY EXPLANATION FOR WHY FIRMS SECOND SOURCE , 1992 .
[6] Karen Fisher-Vanden,et al. Technology diversity and development: Evidence from China's industrial enterprises , 2008 .
[7] 中華人民共和国国家統計局. China statistical yearbook , 1988 .
[8] Christopher T. Conlon,et al. Demand Estimation Under Incomplete Product Availability , 2008 .
[9] S. Abraham Ravid,et al. A Simple Method for Evaluating the Marginal Cost of Unsupplied Electricity , 1982 .
[10] Elspeth Thomson. Power Shortages in China: Why? , 2005 .
[11] J. Dethier,et al. Firms Operating under Electricity Constraints in Developing Countries , 2011 .
[12] C. Varley. China's power sector reforms : where to next? , 2006 .
[13] Chen,et al. Reliability of Nationwide Transmission and Substation Facilities and Urban Consumer's Power Supply in 2005 , 2006 .
[14] Energy Agency. World Energy Outlook 2007 : China and India Insights , 2007 .
[15] A. Raman,et al. Aligning incentives in supply chains. , 2004, Harvard business review.
[16] A. Mobarak,et al. Development Effects of Electrification: Evidence from the Geologic Placement of Hydropower Plants in Brazil , 2011 .
[17] S. Graves,et al. Supply chain management : design, coordination and operation , 2003 .
[18] R. Billinton,et al. Approximate methods for event-based customer interruption cost evaluation , 2005, IEEE Transactions on Power Systems.
[19] Taryn Dinkelman. The Effects of Rural Electrification on Employment: New Evidence from South Africa , 2011 .
[20] R. Reinikka,et al. Coping with poor public capital , 2002 .
[21] Roy Jensen,et al. The Economics of Power System Reliability and Planning , 1979 .
[22] Lucas W. Davis,et al. The Welfare Costs of Unreliable Water Service , 2010 .