Managing stakeholders’ participation to improve project scope definition completeness and enhance project outcome

I DECLARATION V ACKNOWLEDGEMENTS VII LIST OF PUBLICATIONS IX TABLE OF CONTENTS XI LIST OF FIGURES XVI LIST OF TABLES XVIII LIST OF ABBREVIATIONS XXI CHAPTER 1: INTRODUCTION 1 1.

[1]  Anthony Walker,et al.  Evaluation of project outcomes , 1998 .

[2]  Ibrahim M. Mahdi,et al.  Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .

[3]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[4]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[5]  Tom R. Tyler,et al.  Cooperation in Groups: Procedural Justice, Social Identity, and Behavioral Engagement , 2000 .

[6]  T. Saaty Fundamentals of the analytic network process — Dependence and feedback in decision-making with a single network , 2004 .

[7]  John N. Warfield,et al.  Developing Interconnection Matrices in Structural Modeling , 1974, IEEE Trans. Syst. Man Cybern..

[8]  Hong-Tau Lee,et al.  Performance evaluation model for project managers using managerial practices , 2007 .

[9]  J. Alavalapati,et al.  Exploring the potential for silvopasture adoption in south-central Florida: an application of SWOT–AHP method , 2004 .

[10]  Marian N. Ruderman,et al.  The role of procedural and distributive justice in organizational behavior , 1987 .

[11]  Thomas L. Saaty What is the analytic hierarchy process , 1988 .

[12]  Renée A. Irvin,et al.  Citizen Participation in Decision Making: Is It Worth the effort? , 2004 .

[13]  Tom R. Tyler,et al.  What is procedural justice? Criteria used by citizens to assess the fairness of legal procedures. , 1988 .

[14]  Hamdi A. Bashir,et al.  Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study , 2015 .

[15]  Sławomir Biruk,et al.  Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .

[16]  Lynn Crawford,et al.  Fundamental uncertainties in projects and the scope of project management , 2006 .

[17]  Geoffrey Qiping Shen,et al.  Critical Success Factors of the Briefing Process for Construction Projects , 2015 .

[18]  Richard Whittington,et al.  Exploring Corporate Strategy , 1988 .

[19]  Stephen O. Ogunlana,et al.  Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling , 2001 .

[20]  Su Liying Application of Value Management in PFI Projects , 2007 .

[21]  Robert Y. Cavana,et al.  Applied Business research: Qualitative and Quantitative Methods , 2001 .

[22]  Rene V. Dawis The theory of work adjustment as convergent theory , 1994 .

[23]  G. Winch Managing Project Stakeholders , 2007 .

[24]  G. Edward Gibson,et al.  Project Success Index for Capital Facility Construction Projects , 1999 .

[25]  Stefan Olander,et al.  Stakeholder impact analysis in construction project management , 2007 .

[26]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[27]  Peter Barrett,et al.  Better Construction Briefing , 1999 .

[28]  Abdulsalam A. Al-Sudairi,et al.  Prioritizing barriers to successful business process re‐engineering (BPR) efforts in Saudi Arabian construction industry , 2005 .

[29]  Yu-Ren Wang,et al.  A study of preproject planning and project success using ANNs and regression models , 2008 .

[30]  Yu-ren Wang Applying the PDRI in project risk management , 2002 .

[31]  M. Sambasivan,et al.  Evaluation of critical success factors of implementation of ISO 14001 using analytic hierarchy process (AHP): a case study from Malaysia , 2008 .

[32]  Ann Buchholtz,et al.  Business & Society: Ethics, Sustainability, and Stakeholder Management , 1989 .

[33]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[34]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[35]  A. Kolk,et al.  Stakeholder Mismanagement and Corporate Social Responsibility Crises , 2006 .

[36]  J. Gallego-Ayala,et al.  Integrating Stakeholders’ Preferences into Water Resources Management Planning in the Incomati River Basin , 2014, Water Resources Management.

[37]  Heng Li,et al.  Contractor selection using the analytic network process , 2004 .

[38]  Francisco Herrera,et al.  A practical tutorial on the use of nonparametric statistical tests as a methodology for comparing evolutionary and swarm intelligence algorithms , 2011, Swarm Evol. Comput..

[39]  Aviad Shapira,et al.  Systematic Evaluation of Construction Equipment Alternatives: Case Study , 2007 .

[40]  Ajibade Ayodeji Aibinu,et al.  The relationship between distribution of control, fairness and potential for dispute in the claims handling process , 2006 .

[41]  Derek H.T. Walker,et al.  Client/customer or stakeholder focus? ISO 14000 EMS as a construction industry case study , 2000 .

[42]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[43]  Kalle Kähkönen,et al.  Multi-character model of the construction project definition process , 1999 .

[44]  M. Edelstein,et al.  Citizen participation and emprowerment: The case of local environmental hazards , 1995, American journal of community psychology.

[45]  X. Xue,et al.  Stakeholder management in construction : an empirical study to address research gaps in previous studies , 2011 .

[46]  G. E. Gibson,et al.  Preproject-Planning Process for Capital Facilities , 1995 .

[47]  Xiande Zhao,et al.  An application of quality function deployment to improve the quality of teaching , 1998 .

[48]  T. Saaty Decision making — the Analytic Hierarchy and Network Processes (AHP/ANP) , 2004 .

[49]  Kam Jugdev,et al.  A Retrospective look at our Evolving Understanding of Project Success , 2005, IEEE Engineering Management Review.

[50]  Ali A. Shash,et al.  Factors affecting a contractor's mark-up size decision in Saudi Arabia , 1992 .

[51]  Eddie W.L. Cheng,et al.  Information priority-setting for better resource allocation using analytic hierarchy process (AHP) , 2001, Inf. Manag. Comput. Secur..

[52]  Albert P.C. Chan,et al.  Benchmarking the performance of design‐build projects: Development of project success index , 2007 .

[53]  Ronald K. Mitchell,et al.  Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of who and What Really Counts , 1997 .

[54]  Heng Li,et al.  Analytic network process applied to project selection , 2005 .

[55]  P. Earley,et al.  Voice, control, and procedural justice : instrumental and noninstrumental concerns in fairness judgments , 1990 .

[56]  R. Müller,et al.  The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project , 2007 .

[57]  Thomas L. Saaty,et al.  The Analytic Hierarchy and Analytic Network Processes for the Measurement of Intangible Criteria and for Decision-Making , 2016 .

[58]  J. Thibaut,et al.  Procedural Justice: A Psychological Analysis , 1976 .

[59]  Edmund M. Burke A participatory approach to urban planning , 1979 .

[60]  R. Phillips Stakeholder Theory and Organizational Ethics , 2003 .

[61]  Jih-Jeng Huang,et al.  Multidimensional data in multidimensional scaling using the analytic network process , 2005, Pattern Recognit. Lett..

[62]  Qiping Shen,et al.  An empirical study of the variables affecting construction project briefing/architectural programming , 2007 .

[63]  Ludmil Mikhailov,et al.  Group prioritization in the AHP by fuzzy preference programming method , 2004, Comput. Oper. Res..

[64]  David J. Edwards,et al.  A rework reduction model for construction projects , 2004, IEEE Transactions on Engineering Management.

[65]  John W. Creswell,et al.  Designing and Conducting Mixed Methods Research , 2006 .

[66]  Richard H. Watson,et al.  Interpretive structural modeling—A useful tool for technology assessment? , 1978 .

[67]  Juan L. Cano,et al.  Guided reflection on project definition , 2011 .

[68]  P Vink,et al.  Defining stakeholder involvement in participatory design processes. , 2008, Applied ergonomics.

[69]  O. Williamson Transaction-Cost Economics: The Governance of Contractual Relations , 1979, The Journal of Law and Economics.

[70]  Neil D. Weinstein,et al.  Behavioral Commitment to Environmental Protection , 1987 .

[71]  R. Mauborgne,et al.  Procedural justice, strategic decision making, and the knowledge economy , 1998 .

[72]  M. Ramachandran,et al.  Application of multi-criteria decision making to sustainable energy planning--A review , 2004 .

[73]  G. Ofori,et al.  Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: contractors' perspectives , 2011 .

[74]  R. Shankar,et al.  An interpretive structural modeling of knowledge management in engineering industries , 2003 .

[75]  Nabil Kartam,et al.  A project control process in pre‐construction phases , 2005 .

[76]  J. Innes Planning Through Consensus Building: A New View of the Comprehensive Planning Ideal , 1996 .

[77]  Bruce Langtry,et al.  Stakeholders and the Moral Responsibilities of Business , 1994, Business Ethics Quarterly.

[78]  Seth Tuler,et al.  Voices from the Forest: What Participants Expect of a Public Participation Process , 1999 .

[79]  George Galster,et al.  Residential Satisfaction , 1981, Encyclopedia of Gerontology and Population Aging.

[80]  Lavagnon A. Ika Project Success as a Topic in Project Management Journals , 2009 .

[81]  Sean Pascoe,et al.  Management Objective Importance in Fisheries: An Evaluation Using the Analytic Hierarchy Process (AHP) , 2004, Environmental management.

[82]  Ann Buchholtz,et al.  Business and Society: Ethics and Stakeholder Management , 2005 .

[83]  John M. Bryson,et al.  What To Do When Stakeholders Matter: A Guide to Stakeholder Identification and Analysis Techniques , 2003 .

[84]  Emre Cakmak,et al.  An Analysis of Causes of Disputes in the Construction Industry Using Analytical Hierarchy Process (AHP) , 2013 .

[85]  S. G. Deshmukh,et al.  Development of a balanced scorecard , 2006 .

[86]  Thomas L. Saaty,et al.  Time dependent decision-making; dynamic priorities in the AHP/ANP: Generalizing from points to functions and from real to complex variables , 2007, Math. Comput. Model..

[87]  Nang-Fei Pan,et al.  FUZZY AHP APPROACH FOR SELECTING THE SUITABLE BRIDGE CONSTRUCTION METHOD , 2008 .

[88]  Susan S. Suarez,et al.  Appendix C , 1977, Annals of the ICRP.

[89]  Mubarak Faraj Saeed. Al-Besher A Conceptual model for consultant selection in Saudi Arabia. , 1998 .

[90]  I. Bramadat,et al.  Satisfaction with childbirth: theories and methods of measurement. , 1993, Birth.

[91]  David I. Cleland,et al.  Project Stakeholder Management , 2008 .

[92]  R. Freeman The Politics of Stakeholder Theory: Some Future Directions , 1994, Business Ethics Quarterly.

[93]  Thomas L. Saaty,et al.  The Analytic Hierarchy Process: Decision Making in Complex Environments , 1984 .

[94]  Heng Li,et al.  Analytic hierarchy process , 2001 .

[95]  Scott W. VanderStoep,et al.  Comprar Research Methods for Everyday Life: Blending Qualitative and Quantitative Approaches | Scott W. VanderStoep | 9780470343531 | Wiley , 2008 .

[96]  Peter E.D. Love,et al.  Triangulation in construction management research , 2002 .

[97]  Participatory Partnerships: Engaging and Empowering to Enhance Environmental Management and Quality of Life? , 2005 .

[98]  Heng Li,et al.  The analytic network process (ANP) approach to location selection: a shopping mall illustration , 2005 .

[99]  R. M. Woodhead Investigation of the early stages of project formulation , 2000 .

[100]  Semra Boran,et al.  A Study On Election Of Personnel Based On Performance Measurement By Using Analytic Network Process (ANP) , 2008 .

[101]  Mohammed I Al Khalil,et al.  Selecting the appropriate project delivery method using AHP , 2002 .

[102]  Marta Carla Bottero,et al.  Integrating multicriteria evaluation and stakeholders analysis for assessing hydropower projects , 2014 .

[103]  Thomas L. Saaty,et al.  Group Decision Making and the AHP , 1989 .

[104]  D. W. Malone,et al.  An introduction to the application of interpretive structural modeling , 1975, Proceedings of the IEEE.

[105]  Francis T. Hartman,et al.  Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .

[106]  Samuel D. Brody,et al.  Measuring the Effects of Stakeholder Participation on the Quality of Local Plans Based on the Principles of Collaborative Ecosystem Management , 2003 .

[107]  Brent K. Marshall,et al.  CITIZEN PARTICIPATION IN NATURAL RESOURCE MANAGEMENT: DOES REPRESENTATIVENESS MATTER? , 2005 .

[108]  Kevin Gibson,et al.  The Moral Basis of Stakeholder Theory , 2000 .

[109]  A. Kangas,et al.  Decision Support for Forest Management , 2008, Managing Forest Ecosystems.

[110]  Derek S. Thomson,et al.  A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success , 2011 .

[111]  R. Max Wideman How to Motivate All Stakeholders to Work Together , 2007 .

[112]  A. Maslow A Theory of Human Motivation , 1943 .

[113]  G. Edward Gibson,et al.  Scope Management Using Project Definition Rating Index , 1997 .

[114]  G. Edward Gibson,et al.  Building Project Scope Definition Using Project Definition Rating Index , 2001 .

[115]  David M. Konisky,et al.  What are we Gaining from Stakeholder Involvement? Observations from Environmental Planning in the Great Lakes , 2001 .

[116]  D. C. Shin,et al.  Avowed happiness as an overall assessment of the quality of life , 1978 .

[117]  Derek H.T. Walker,et al.  Visualising and mapping stakeholder influence , 2005 .

[118]  A. Bryman Social Research Methods , 2001 .

[119]  Per Anker Jensen Inclusive Briefing and User Involvement: Case Study of a Media Centre in Denmark , 2011 .

[120]  C. Prell,et al.  Stakeholder Analysis and Social Network Analysis in Natural Resource Management , 2009, Society & Natural Resources.

[121]  Rifat Gürcan Özdemir,et al.  A hybrid approach to concept selection through fuzzy analytic network process , 2009, Comput. Ind. Eng..

[122]  C. Sullivan Calculating a Water Poverty Index , 2002 .

[123]  G. Leventhal What Should Be Done with Equity Theory , 1980 .

[124]  Lynda M. Bourne,et al.  Project Relationship Management and the Stakeholder Circle , 2010 .

[125]  S. Arnstein,et al.  Ladder of Citizen Participation , 2020 .

[126]  Stefan Olander,et al.  Evaluation of stakeholder influence in the implementation of construction projects , 2005 .

[127]  P. Olomolaiye,et al.  Introducing Stakeholder Management , 2010 .

[128]  Mark F. Peterson,et al.  A Test of Participation Theory in a Work Re-design Field Setting: Degree of Participation and Comparison Site Contrasts , 1989 .

[129]  Mohammed M Alkhathami,et al.  EXAMINATION OF THE CORRELATION OF CRITICAL SUCCESS AND DELAY FACTORS IN CONSTRUCTION PROJECTS IN THE KINGDOM OF SAUDI ARABIA , 2005 .

[130]  Jeanne M. Brett,et al.  Comparing three processes underlying judgments of procedural justice : a field study of mediation and arbitration , 1993 .

[131]  John N. Warfield,et al.  Toward Interpretation of Complex Structural Models , 1974, IEEE Trans. Syst. Man Cybern..

[132]  Mohammed Al-Khalil,et al.  Delay in public utility projects in Saudi Arabia , 1999 .

[133]  Richard Warren Smith,et al.  A theoretical basis for participatory planning , 1973 .

[134]  Iris D. Tommelein,et al.  A knowledge management framework for project definition , 2002, J. Inf. Technol. Constr..

[135]  K. Aaltonen,et al.  Stakeholder salience in global projects , 2008 .

[136]  M. Marshall Sampling for qualitative research. , 1996, Family practice.

[137]  D. Schweiger,et al.  Building Commitment, Attachment, and Trust in Strategic Decision-Making Teams: The Role of Procedural Justice , 1995 .

[138]  Ezekiel Chinyio,et al.  Practical approaches for engaging stakeholders: findings from the UK , 2008 .

[139]  M. Grant,et al.  User satisfaction and sustainability of drinking water schemes in rural communities of Nepal , 2007 .

[140]  Bon-Gang Hwang,et al.  Measuring the Impact of Rework on Construction Cost Performance , 2009 .

[141]  Chris Chapman,et al.  Transforming project risk management into project uncertainty management , 2003 .

[142]  Albert P.C. Chan,et al.  Framework of Success Criteria for Design/Build Projects , 2002 .

[143]  K. Perreault,et al.  Research Design: Qualitative, Quantitative, and Mixed Methods Approaches , 2011 .

[144]  Saad H.S. Al-Jibouri,et al.  Identifying key performance indicators for use in control of pre‐project stage process in construction , 2009 .

[145]  Zhen Chen,et al.  Measuring the maturity of risk management in large-scale construction projects , 2013 .

[146]  Nora El-Gohary,et al.  Semantic System for Stakeholder-Conscious Infrastructure Project Planning and Design , 2015 .

[147]  S. Deshmukh,et al.  Vendor Selection Using Interpretive Structural Modelling (ISM) , 1994 .

[148]  Tom R. Tyler,et al.  Social Justice: Outcome and Procedure , 2000 .

[149]  Ekambaram Palaneeswaran,et al.  Improving megaproject briefing through enhanced collaboration with ICT , 2009 .

[150]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[151]  G. E. Gibson,et al.  Alignment during preproject planning , 2001 .

[152]  S. Linder-Pelz Toward a theory of patient satisfaction. , 1982, Social science & medicine.

[153]  Lynda M. Bourne Project relationship management and the Stakeholder Circle e , 2005 .

[154]  Faisal Manzoor Arain,et al.  Contractors’ Views of the Potential Causes of Inconsistencies between Design and Construction in Saudi Arabia , 2006 .

[155]  Francis T. Hartman,et al.  Contractors' Construction‐Claims Avoidance , 1994 .

[156]  D. Wolfe,et al.  Nonparametric Statistical Methods. , 1974 .

[157]  Steven L. Blader,et al.  The Group Engagement Model: Procedural Justice, Social Identity, and Cooperative Behavior , 2003, Personality and social psychology review : an official journal of the Society for Personality and Social Psychology, Inc.

[158]  Johnny Wong,et al.  Evaluating the system intelligence of the intelligent building systems: Part 2: Construction and validation of analytical models , 2008 .