Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility
暂无分享,去创建一个
[1] Yeong-Dae Kim,et al. Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility , 1998 .
[2] Robert W. Atherton,et al. Wafer Fabrication: Factory Performance and Analysis , 1995 .
[3] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[4] Oliver Rose. CONWIP-like Lot Release for a Wafer Fabrication Facility with Dynamic Load Changes , 2001 .
[5] L. Mönch,et al. Optimierung der Stepperbelegung in einer Halbleiterfabrik , 2001 .
[6] Steven Brown,et al. A rapid modeling technique for measurable improvements in factory performance , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[7] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[8] Gary L. Hogg,et al. Workload control in the semiconductor industry , 2002 .
[9] Fred W. Glover,et al. Tabu Search , 1997, Handbook of Heuristics.