Mobile On-site Factories — Scalable and distributed manufacturing systems for the construction industry
暂无分享,去创建一个
[1] Erwin Rauch,et al. On-site Oriented Capacity Regulation for Fabrication Shops in Engineer-to-Order Companies (ETO) , 2015 .
[2] Carlos Balaguer,et al. Trends in Robotics and Automation in Construction , 2008 .
[3] Alistair G.F. Gibb,et al. Re-engineering through pre-assembly: client expectations and drivers , 2003 .
[4] Gregory A. Howell,et al. Toward construction JIT , 1997 .
[5] Dominik T. Matt,et al. Template based production system design , 2008 .
[6] David S. Cochran,et al. Axiomatic Design of Manufacturing Systems , 1996 .
[7] Erwin Rauch,et al. Design of a Network of Scalable Modular Manufacturing Systems to Support Geographically Distributed Production of Mass Customized Goods , 2013 .
[8] Jørgen Nielsen,et al. Just-in-time logistics in the supply of building materials , 1997 .
[9] Alberto Jardón,et al. Flexible field factory for construction industry , 2013 .
[10] Dominik T. Matt,et al. Design of Lean Manufacturing Support Systems in Make-to-Order Production , 2009 .
[11] Håkan Norberg,et al. On-site production synchronisation : improving the resource-flow in construction projects , 2008 .
[12] L. Koskela. Is structural change the primary solution to the problems of construction? , 2003 .
[13] Dominik T. Matt. Axiomatic Design of Agile Manufacturing Systems , 2010 .
[14] Erwin Rauch,et al. SMART Reconfigurability Approach in Manufacture of Steel and Façade Constructions , 2014 .
[15] Ash Genaidy,et al. Moving from lean manufacturing to lean construction: Toward a common sociotechnological framework , 2005 .
[16] Nam P. Suh,et al. Axiomatic Design: Advances and Applications , 2001 .
[17] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[18] Erwin Rauch,et al. Synchronization of the Manufacturing Process and On-site Installation in ETO Companies , 2014 .
[19] Thomas Bock,et al. Construction Automation and Robotics , 2008 .
[20] Manfredi Bruccoleri,et al. Production planning in reconfigurable enterprises and reconfigurable production systems , 2005 .
[21] Iris D. Tommelein,et al. More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .
[22] Yukio Hasegawa. Construction Automation and Robotics in the 21st Century , 2006 .
[23] Taiichi Ohno,et al. The Toyota Production System , 1984 .
[24] Gerhard Girmscheid. Industrialization in building construction , 2005 .
[25] Erwin Rauch,et al. Implementing Lean in Engineer- to-Order Manufacturing: Experiences from a ETO Manufacturer , 2014 .
[26] Erwin Rauch,et al. Trends towards Distributed Manufacturing Systems and modern forms for their design , 2015 .
[27] Christine Pasquire,et al. Leaner Construction Through Off-Site Manufacturing , 2002 .
[28] Shigeomi Nishigaki,et al. Development of virtual and real-field construction management systems in innovative, intelligent field factory , 2000 .
[29] E. Zavadskas,et al. COPRAS based Comparative Analysis of the European Country Management Capabilities within the Construction Sector in the Time of Crisis , 2011 .
[30] Erwin Rauch. Konzept eines wandlungsfähigen und modularen Produktionssystems für Franchising-Modelle , 2013 .