Mobile On-site Factories — Scalable and distributed manufacturing systems for the construction industry

The concept of the “On-site Factory” consists in the temporary use of fully functioning mobile mini-factories or production cells at the site of consumption. This concept of a Mobile Factory is well suitable for situations in the construction industry with long distances and therefore high logistics costs. The advantage of this concept is not only the proximity to customers, but also the economic efficiency combined with a maximum of flexibility. By a high degree of reconfigurability and scalability of the On-site Factory, it can also be adapted to its individual mission and the quantity demand at the construction site. This paper presents the current state of research in the area of distributed manufacturing as well as on-site and off-site manufacturing. It discusses the need for new and innovative JIT solutions for construction industry and addresses the specific requirements for scalable and reconfigurable on-site manufacturing factories. The main content of this research paper consists in the definition of generally applicable Design Parameters for On-site Factories using Axiomatic Design as a methodology for the analysis of functional requirements and the related design solutions. Through practical examples and illustrations, the application of the deduced Design Parameters will be explained.

[1]  Erwin Rauch,et al.  On-site Oriented Capacity Regulation for Fabrication Shops in Engineer-to-Order Companies (ETO) , 2015 .

[2]  Carlos Balaguer,et al.  Trends in Robotics and Automation in Construction , 2008 .

[3]  Alistair G.F. Gibb,et al.  Re-engineering through pre-assembly: client expectations and drivers , 2003 .

[4]  Gregory A. Howell,et al.  Toward construction JIT , 1997 .

[5]  Dominik T. Matt,et al.  Template based production system design , 2008 .

[6]  David S. Cochran,et al.  Axiomatic Design of Manufacturing Systems , 1996 .

[7]  Erwin Rauch,et al.  Design of a Network of Scalable Modular Manufacturing Systems to Support Geographically Distributed Production of Mass Customized Goods , 2013 .

[8]  Jørgen Nielsen,et al.  Just-in-time logistics in the supply of building materials , 1997 .

[9]  Alberto Jardón,et al.  Flexible field factory for construction industry , 2013 .

[10]  Dominik T. Matt,et al.  Design of Lean Manufacturing Support Systems in Make-to-Order Production , 2009 .

[11]  Håkan Norberg,et al.  On-site production synchronisation : improving the resource-flow in construction projects , 2008 .

[12]  L. Koskela Is structural change the primary solution to the problems of construction? , 2003 .

[13]  Dominik T. Matt Axiomatic Design of Agile Manufacturing Systems , 2010 .

[14]  Erwin Rauch,et al.  SMART Reconfigurability Approach in Manufacture of Steel and Façade Constructions , 2014 .

[15]  Ash Genaidy,et al.  Moving from lean manufacturing to lean construction: Toward a common sociotechnological framework , 2005 .

[16]  Nam P. Suh,et al.  Axiomatic Design: Advances and Applications , 2001 .

[17]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[18]  Erwin Rauch,et al.  Synchronization of the Manufacturing Process and On-site Installation in ETO Companies , 2014 .

[19]  Thomas Bock,et al.  Construction Automation and Robotics , 2008 .

[20]  Manfredi Bruccoleri,et al.  Production planning in reconfigurable enterprises and reconfigurable production systems , 2005 .

[21]  Iris D. Tommelein,et al.  More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .

[22]  Yukio Hasegawa Construction Automation and Robotics in the 21st Century , 2006 .

[23]  Taiichi Ohno,et al.  The Toyota Production System , 1984 .

[24]  Gerhard Girmscheid Industrialization in building construction , 2005 .

[25]  Erwin Rauch,et al.  Implementing Lean in Engineer- to-Order Manufacturing: Experiences from a ETO Manufacturer , 2014 .

[26]  Erwin Rauch,et al.  Trends towards Distributed Manufacturing Systems and modern forms for their design , 2015 .

[27]  Christine Pasquire,et al.  Leaner Construction Through Off-Site Manufacturing , 2002 .

[28]  Shigeomi Nishigaki,et al.  Development of virtual and real-field construction management systems in innovative, intelligent field factory , 2000 .

[29]  E. Zavadskas,et al.  COPRAS based Comparative Analysis of the European Country Management Capabilities within the Construction Sector in the Time of Crisis , 2011 .

[30]  Erwin Rauch Konzept eines wandlungsfähigen und modularen Produktionssystems für Franchising-Modelle , 2013 .