Multicriteria transformer asset management with maintenance and planning perspectives
暂无分享,去创建一个
Ricardo H. C. Takahashi | Lucas S. Batista | Felipe Campelo | Eduardo G. Carrano | Henrique E.P. Diniz | E. G. Carrano | R. Takahashi | F. Campelo | L. Batista | Henrique E.P. Diniz
[1] Debanjan Mitra,et al. Likelihood inference for lognormal data with left truncation and right censoring with an illustratio , 2011 .
[2] M. Fotuhi-Firuzabad,et al. An Efficient Mixed-Integer Linear Formulation for Long-Term Overhead Lines Maintenance Scheduling in Power Distribution Systems , 2009, IEEE Transactions on Power Delivery.
[3] P A A F Wouters,et al. Remaining lifetime modeling of power transformers: individual assets and fleets , 2011, IEEE Electrical Insulation Magazine.
[4] J. Gower. A General Coefficient of Similarity and Some of Its Properties , 1971 .
[5] Wenyuan Li,et al. Power system equipment aging , 2006, IEEE Power and Energy Magazine.
[6] D.S. Popovic,et al. Selective Maintenance Schedule of Distribution Networks Based on Risk Management Approach , 2007, IEEE Transactions on Power Systems.
[7] Yili Hong,et al. Prediction of remaining life of power transformers based on left truncated and right censored lifetime data , 2009, 0908.2901.
[8] H. Borsi,et al. Estimation of the Lifetime of the Electrical Components in Distribution Networks , 2007, IEEE Transactions on Power Delivery.