Improving Performance through an Integrated Manufacturing Program

Every five to 10 years, a new manufacturing management program is introduced as the panacea for poor performance, although these programs have had mixed success. Many academics and practitioners believe that failures are due to the partial implementation of the programs and incompatible systems within the plant. Yet past research primarily considers manufacturing programs in isolation. In this article, the authors present a framework for integrating manufacturing programs, using the well-developed programs of total quality management (TQM), just-in-time (JIT), and total productive maintenance (TPM). These three programs are often considered components of the popular Lean manufacturing. The authors discuss the theoretical foundation for the positive impact of an integrated manufacturing program on manufacturing performance. They explore the theoretical relationships using structural equation modeling on a sample of 163 manufacturing plants. The authors' analysis provides evidence of the need for integrating the manufacturing practices. In their framework, together the practices of TQM, JIT, and TPM exhibit a consistent positive effect on multiple dimensions of manufacturing performance. The findings demonstrate the importance of implementing manufacturing practices that belong to all three programs and of integrating new programs with existing practices.

[1]  Allan Tomlinson Introduction to the TPM , 2008 .

[2]  Diana D. Suhr The Basics of Structural Equation Modeling , 2006 .

[3]  Kenneth M. York,et al.  Causation or covariation: An empirical re-examination of the link between TQM and financial performance , 2004 .

[4]  Rosemary R. Fullerton,et al.  AN EXAMINATION OF THE RELATIONSHIPS BETWEEN JIT AND FINANCIAL PERFORMANCE , 2003 .

[5]  R. Schroeder,et al.  Relationships between implementation of TQM, JIT, and TPM and manufacturing performance , 2001 .

[6]  M. Terziovski,et al.  The relationship between total quality management practices and operational performance , 1999 .

[7]  P. Bentler,et al.  Cutoff criteria for fit indexes in covariance structure analysis : Conventional criteria versus new alternatives , 1999 .

[8]  R. Schroeder,et al.  Total productive maintenance: a contextual view , 1999 .

[9]  Varun Grover,et al.  Strategic Information Systems Planning: Planning System Dimensions, Internal Coalignment, and Implications for Planning Effectiveness , 1998 .

[10]  James A. Ward TQM and the Year 2000 Crisis , 1998, Inf. Syst. Manag..

[11]  V. Donk Operations management: future issues and competitive response , 1998 .

[12]  Ron McLachlin,et al.  Management initiatives and just-in-time manufacturing , 1997 .

[13]  K. B. Hendricks,et al.  Does Implementing an Effective TQM Program Actually Improve Operating Performance? Empirical Evidence from Firms That Have Won Quality Awards , 1997 .

[14]  Roger G. Schroeder,et al.  The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .

[15]  A. V. Bruno,et al.  Building value: Customer and shareholder , 1997 .

[16]  Thomas Y. Choi,et al.  Top managers and TQM success: One more look after all these years , 1997 .

[17]  Russell L. Ackoff Strategies, systems, and organizations: An interview with Russell L. Ackoff , 1997 .

[18]  Roger G. Schroeder,et al.  Relationship between JIT managerial practice and JIT infrastructure: Implications for plant performance , 1996 .

[19]  Sanjay L. Ahire,et al.  Development and Validation of TQM Implementation Constructs , 1996 .

[20]  L. J. Porter,et al.  Identification of the Critical Factors of TQM , 1996 .

[21]  Richard J. Schonberger,et al.  World Class Manufacturing : The Next Decade : Building Power, Strength and Value , 1996 .

[22]  Roger G. Schroeder,et al.  Relationship Between JIT and TQM: Practices and Performance , 1995 .

[23]  Charles J. Robinson,et al.  Implementing TPM: The North American Experience , 1995 .

[24]  Tarun Gupta,et al.  JIT and TQM: a case for joint implementation , 1995 .

[25]  Paul Milgrom,et al.  Complementarities and fit strategy, structure, and organizational change in manufacturing , 1995 .

[26]  T. C. Powell Total Quality Management as Competitive Advantage , 1995 .

[27]  Roger G. Schroeder,et al.  A FRAMEWORK FOR QUALITY MANAGEMENT RESEARCH AND AN ASSOCIATED MEASUREMENT INSTRUMENT , 1994 .

[28]  Larry J. Williams,et al.  Parsimony‐based fit indices for multiple‐indicator models: Do they work? , 1994 .

[29]  L. Davis The Coming Crisis for Production Management , 1993 .

[30]  Fred Emery The Nine-Step Model , 1993 .

[31]  A. Cherns Principles of Socio-Technical Design , 1993 .

[32]  J A Davy,et al.  A derivation of the underlying constructs of just-in-time management systems. , 1992, Academy of Management journal. Academy of Management.

[33]  R. Anthony Inman,et al.  Determining the Critical Elements of Just-In-Time Implementation , 1992 .

[34]  土屋 正司,et al.  Quality maintenance : zero defects through equipment management , 1992 .

[35]  J. Hull,et al.  A general approach to testing multifaceted personality constructs. , 1991, Journal of personality and social psychology.

[36]  Roger G. Schroeder,et al.  The effects of organizational context on quality management: An empirical investigation , 1991 .

[37]  Frank Safayeni,et al.  Difficulties of Just‐in‐Time Implementation: A Classification Scheme , 1991 .

[38]  I. Ahuja,et al.  Tpm: Total Productive Maintenance , 1990 .

[39]  Aleda V. Roth,et al.  Competing in World Class Manufacturing: America's 21st Century Challenge , 1990 .

[40]  R. Anthony Inman,et al.  The Transferability of Just-in-Time Concepts to American Small Businesses , 1990 .

[41]  P. Bentler,et al.  Comparative fit indexes in structural models. , 1990, Psychological bulletin.

[42]  N. Venkatraman Performance Implications Of Strategic Coalignment: A Methodological Perspective , 1990 .

[43]  Jayant V. Saraph,et al.  An Instrument for Measuring the Critical Factors of Quality Management , 1989 .

[44]  S. Mulaik,et al.  EVALUATION OF GOODNESS-OF-FIT INDICES FOR STRUCTURAL EQUATION MODELS , 1989 .

[45]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[46]  Christopher A. Voss,et al.  Application of Just‐in‐Time Manufacturing Techniques in the United Kingdom , 1987 .

[47]  John H. Grant,et al.  Construct Measurement in Organizational Strategy Research: A Critique and Proposal , 1986 .

[48]  Richard Schonberger,et al.  World class manufacturing : the lessons of simplicity applied , 1986 .

[49]  T. Hill Manufacturing Strategy: The Strategic Management of the Manufacturing Function , 1985 .

[50]  H. Marsh,et al.  Application of confirmatory factor analysis to the study of self-concept: First- and higher order factor models and their invariance across groups. , 1985 .

[51]  S. Wheelwright,et al.  Restoring Our Competitive Edge: Competing Through Manufacturing , 1984 .

[52]  C. Fornell,et al.  Evaluating structural equation models with unobservable variables and measurement error. , 1981 .

[53]  A. V. D. Ven,et al.  Measuring And Assessing Organizations , 1980 .

[54]  B. Muthén,et al.  Assessing Reliability and Stability in Panel Models , 1977 .

[55]  K. Jöreskog A general method for analysis of covariance structures , 1970 .