Real options decision framework: Strategic operating policies for open pit mine planning

This paper presents a first approach towards the development of a dynamics decision-making tool (DDMT) for open pit mine planning projects. In this paper, a decision framework, the so-called real option decision framework (RODF), is developed based on a real-options approach with practical applicability to a mining investment project. Four strategic operating options namely, deferral options, maintain options, expand options, and shutdown options, are assumed for mining operations. We illustrated the proposed framework and developed methods for a hypothetical gold mine. The standard discounted cash flow (DCF) method was carried out to analyze the project values without options. The real option valuation (ROV) approach was calculated for the deferral and expand options. We used a system dynamics (SD) modeling method to solve real options problems and the discrete-event simulations were used to simulate the potential values of the projects. The findings are that investors are prone to lose an opportunity to invest if relying on traditional DCF-NPV rules as they suggest accepting the project if and only if NPV is greater than zero. However, results obtained from real options suggest that the project has a value to an investor across different time horizons. The insight is that it is of paramount importance to find an optimal time to exercise a strategic option. It is indicated that strategic options such as the deferral option may yield a higher value than the base case (DCF-NPV) mine option because project risks can be hedged, whereas the expand option may also offer additional value to mine operators. However, such extra-additional values can only be captured through managerial flexibility.

[1]  Carsten Drebenstedt,et al.  A Prototype Decision Making Tool of Coal Mine Planning Using System Dynamics Model , 2014 .

[2]  Jerry M. Whiting,et al.  Derivative mine valuation: strategic investment decisions in competitive markets , 1997 .

[3]  James S. Dyer,et al.  Using Binomial Decision Trees to Solve Real-Option Valuation Problems , 2005, Decis. Anal..

[4]  Andreas T. Ernst,et al.  A mixed integer programming model for long term capacity expansion planning: A case study from The Hunter Valley Coal Chain , 2012, Eur. J. Oper. Res..

[5]  Matt Thompson,et al.  Cut-off grade: A real options analysis , 2014 .

[6]  Feniosky Peña-Mora,et al.  Real options and system dynamics approach to model value of implementing a project specific dispute resolution process in construction projects , 2009, Proceedings of the 2009 Winter Simulation Conference (WSC).

[7]  Edward G. Anderson,et al.  Evaluating system dynamics models of risky projects using decision trees: alternative energy projects as an illustrative example , 2010 .

[8]  David N. Ford,et al.  Project management quality and the value of flexible strategies , 2006 .

[9]  G. Davis,et al.  Valuing uncertain asset cash flows when there are no options: A real options approach , 2005 .

[10]  Durward K. Sobek,et al.  Adapting real options to new product development by modeling the second Toyota paradox , 2005, IEEE Transactions on Engineering Management.

[11]  Francois Grobler,et al.  Robust decision making - Application to mine planning under price uncertainty , 2011 .

[12]  Akbar Esfahanipour,et al.  An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection , 2013 .

[13]  T. Copeland Real Options: A Practitioner's Guide , 2001 .

[14]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[15]  H. Askari-Nasab,et al.  A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile , 2014 .

[16]  M. Slade Valuing Managerial Flexibility: An Application of Real-Option Theory to Mining Investments , 2001 .

[17]  David G. Laughton,et al.  Using Stochastic Discounted Cash Flow and Real Option Monte Carlo Simulation to Analyse the Impacts of Contingent Taxes on Mining Projects , 2007 .

[18]  Roussos Dimitrakopoulos,et al.  Evaluating mine plans under uncertainty: Can the real options make a difference? , 2007 .

[19]  Francis A. Longstaff,et al.  Valuing American Options by Simulation: A Simple Least-Squares Approach , 2001 .

[20]  I. MacMillan,et al.  Making real options really work. , 2004, Harvard business review.

[21]  Darrell Rigby,et al.  Management Tools and Techniques: A Survey , 2001 .

[22]  J. Mardones,et al.  Option valuation of real assets: Application to a copper mine with operating flexibility , 1993 .

[23]  Raman Uppal,et al.  Valuing risk and flexibility: A comparison of methods , 1996 .

[24]  S. Howell,et al.  Real Options Analysis , 2001 .

[25]  E. Topal,et al.  A numerical study for a mining project using real options valuation under commodity price uncertainty , 2014 .

[26]  A. Dixit,et al.  Chapter 19 – The Options Approach to Capital Investment , 1998 .

[27]  D. Siegel,et al.  Option Valuation of Claims on Real Assets: The Case of Offshore Petroleum Leases , 1988 .

[28]  Eduardo S. Schwartz,et al.  Evaluating Natural Resource Investments , 1985 .

[29]  L. Trigeorgis Real Options: Managerial Flexibility and Strategy in Resource Allocation , 1996 .

[30]  Eduardo S. Schwartz,et al.  Investment Under Uncertainty. , 1994 .

[31]  S. Erzurumlu,et al.  Sustainable mining development with community using design thinking and multi-criteria decision analysis , 2015 .

[32]  Ramesh Sharda,et al.  Real Options and System Dynamics for Information Technology Investment Decisions: Application to RFID Adoption in Retail , 2013, TMIS.

[33]  R. McDonald,et al.  The Value of Waiting to Invest , 1982 .

[34]  G. Friedl Copeland, Tom/Antikarov, Vladimir, Real Options. A Practitioner’s Guide, Texere LLC, New York 2001, $ 59,95 , 2002 .

[35]  S. Ross,et al.  Option pricing: A simplified approach☆ , 1979 .

[36]  W. T. Huh,et al.  A general strategic capacity planning model under demand uncertainty , 2006 .