A Novel Strategy to Reduce Computational Burden of the Stochastic Security Constrained Unit Commitment Problem

The uncertainty related to the massive integration of intermittent energy sources (e.g., wind and solar generation) is one of the biggest challenges for the economic, safe and reliable operation of current power systems. One way to tackle this challenge is through a stochastic security constraint unit commitment (SSCUC) model. However, the SSCUC is a mixed-integer linear programming problem with high computational and dimensional complexity in large-scale power systems. This feature hinders the reaction times required for decision making to ensure a proper operation of the system. As an alternative, this paper presents a joint strategy to efficiently solve a SSCUC model. The solution strategy combines the use of linear sensitivity factors (LSF) to compute power flows in a quick and reliable way and a method, which dynamically identifies and adds as user cuts those active security constraints N − 1 that establish the feasible region of the model. These two components are embedded within a progressive hedging algorithm (PHA), which breaks down the SSCUC problem into computationally more tractable subproblems by relaxing the coupling constraints between scenarios. The numerical results on the IEEE RTS-96 system show that the proposed strategy provides high quality solutions, up to 50 times faster compared to the extensive formulation (EF) of the SSCUC. Additionally, the solution strategy identifies the most affected (overloaded) lines before contingencies, as well as the most critical contingencies in the system. Two metrics that provide valuable information for decision making during transmission system expansion are studied.

[1]  David L. Woodruff,et al.  Obtaining lower bounds from the progressive hedging algorithm for stochastic mixed-integer programs , 2016, Math. Program..

[2]  Maria Vrakopoulou,et al.  Stochastic security constrained unit commitment and non-spinning reserve allocation with performance guarantees , 2015 .

[3]  Antonio Frangioni,et al.  Large-scale unit commitment under uncertainty: an updated literature survey , 2018, Annals of Operations Research.

[4]  M. Shahidehpour,et al.  Stochastic Security-Constrained Unit Commitment , 2007, IEEE Transactions on Power Systems.

[5]  Mohammad Shahidehpour,et al.  Stochastic SCUC Solution With Variable Wind Energy Using Constrained Ordinal Optimization , 2014, IEEE Transactions on Sustainable Energy.

[6]  Yong Fu,et al.  Fully Parallel Stochastic Security-Constrained Unit Commitment , 2016, IEEE Transactions on Power Systems.

[7]  Chao Li,et al.  N-1 Reliable Unit Commitment via Progressive Hedging , 2015 .

[8]  Mohammad Shahidehpour,et al.  Impact of Security on Power Systems Operation , 2005, Proceedings of the IEEE.

[9]  Xiaohong Guan,et al.  A Systematic Method for Constructing Feasible Solution to SCUC Problem With Analytical Feasibility Conditions , 2012, IEEE Transactions on Power Systems.

[10]  Di Ye,et al.  Research on Solving Method of Security Constrained Unit Commitment Based on Improved Stochastic Constrained Ordinal Optimization , 2018, 2018 3rd International Conference on Intelligent Green Building and Smart Grid (IGBSG).

[11]  Esteban Gil,et al.  Short-term Hydrothermal Generation Scheduling Using a Parallelized Stochastic Mixed-integer Linear Programming Algorithm , 2016 .

[12]  Erlon Cristian Finardi,et al.  Applying different decomposition schemes using the progressive hedging algorithm to the operation pl , 2012 .

[13]  Jianhui Wang,et al.  Stochastic Optimization for Unit Commitment—A Review , 2015, IEEE Transactions on Power Systems.

[14]  R. Tyrrell Rockafellar,et al.  Scenarios and Policy Aggregation in Optimization Under Uncertainty , 1991, Math. Oper. Res..

[15]  Feng Qiu,et al.  Transmission Constraint Filtering in Large-Scale Security-Constrained Unit Commitment , 2019, IEEE Transactions on Power Systems.

[16]  Jesús M. López-Lezama,et al.  Implementation of User Cuts and Linear Sensitivity Factors to Improve the Computational Performance of the Security-Constrained Unit Commitment Problem , 2019 .

[17]  Andres Ramos,et al.  Security Constrained Unit Commitment Using Line Outage Distribution Factors , 2018, IEEE Transactions on Power Systems.

[18]  Jong-Keun Park,et al.  Stochastic security-constrained unit commitment with wind power generation based on dynamic line rating , 2018, International Journal of Electrical Power & Energy Systems.

[19]  Hadi Zayandehroodi,et al.  A New Formulation to Reduce the Number of Variables and Constraints to Expedite SCUC in Bulky Power Systems , 2019 .

[20]  D. Ernst,et al.  Contingency Filtering Techniques for Preventive Security-Constrained Optimal Power Flow , 2007, IEEE Transactions on Power Systems.

[21]  David L. Woodruff,et al.  Progressive hedging innovations for a class of stochastic mixed-integer resource allocation problems , 2011, Comput. Manag. Sci..

[22]  Pierre Pinson,et al.  Stochastic unit commitment via Progressive Hedging — extensive analysis of solution methods , 2015, 2015 IEEE Eindhoven PowerTech.

[23]  D. Moitre,et al.  Benders Decomposition applied to Security Constrained Unit Commitment , 2013, IEEE Latin America Transactions.

[24]  John M. Mulvey,et al.  Applying the progressive hedging algorithm to stochastic generalized networks , 1991, Ann. Oper. Res..

[25]  M. L. Santos,et al.  Practical aspects in solving the medium-term operation planning problem of hydrothermal power systems by using the progressive hedging method , 2009 .

[26]  David L. Woodruff,et al.  Integration of progressive hedging and dual decomposition in stochastic integer programs , 2015, Oper. Res. Lett..

[27]  M. Shahidehpour,et al.  Security-Constrained Unit Commitment With Volatile Wind Power Generation , 2008, IEEE Transactions on Power Systems.

[28]  Zuyi Li,et al.  Comparison of Scenario-Based and Interval Optimization Approaches to Stochastic SCUC , 2012, IEEE Transactions on Power Systems.

[29]  M. Shahidehpour,et al.  AC contingency dispatch based on security-constrained unit commitment , 2006, IEEE Transactions on Power Systems.

[30]  Xiaohong Guan,et al.  Fast Identification of Inactive Security Constraints in SCUC Problems , 2010, IEEE Transactions on Power Systems.

[31]  Daniel S. Kirschen,et al.  Comparison of state-of-the-art transmission constrained unit commitment formulations , 2013, 2013 IEEE Power & Energy Society General Meeting.

[32]  Russell Bent,et al.  Unit commitment with N-1 Security and wind uncertainty , 2016, 2016 Power Systems Computation Conference (PSCC).

[33]  S. M. Shahidehpour,et al.  Transmission-constrained unit commitment based on Benders decomposition , 1998 .

[34]  Omid Alizadeh Mousavi,et al.  Stochastic Security Constrained Unit Commitment with variable-speed pumped-storage Hydropower Plants , 2016, 2016 Power Systems Computation Conference (PSCC).