Outcomes from the fatigue testing of seventeen centre fuselage structures
暂无分享,去创建一个
[1] Simon Barter,et al. Interpreting fatigue test results using a probabilistic fracture approach , 2005 .
[2] Service fatigue cracking in an aircraft bulkhead exposed to a corrosive environment , 2013 .
[3] Lorrie Molent,et al. A method for evaluation of in-service fatigue cracks , 2005 .
[4] A. J. Green,et al. Characterisation of equivalent initial flaw sizes in 7050 aluminium alloy , 2006 .
[5] Lorrie Molent,et al. An experimental evaluation of fatigue crack growth , 2005 .
[6] L. Molent,et al. A review of equivalent pre-crack sizes in aluminium alloy 7050-T7451 , 2014 .
[7] Russell Wanhill,et al. Typical fatigue-initiating discontinuities in metallic aircraft structures , 2012 .
[8] Lorrie Molent,et al. Verification of an individual aircraft fatigue monitoring system , 2012 .
[9] K. J. Miller,et al. What is fatigue damage? A view point from the observation of low cycle fatigue process , 2005 .
[11] Lorrie Molent,et al. A comparison of crack growth behaviour in several full-scale airframe fatigue tests , 2007 .
[12] Simon Barter,et al. Investigation using quantitative fractography of an unexpected failure in an F/A-18 centre fuselage bulkhead in the FINAL teardown program , 2009 .
[13] L. Molent,et al. The equivalence of EPS and EIFS based on the same crack growth life data , 2015 .
[14] Lorrie Molent,et al. Verification of an airframe fatigue life monitoring system using ex-service structure , 2018 .
[15] Lorrie Molent,et al. A study of fatigue variability in aluminium alloy 7050-T7451 , 2016 .
[16] Steve C Galea,et al. Thermoelastic stress analysis and structural health monitoring: An emerging nexus , 2015 .
[17] Russell Wanhill,et al. The lead crack fatigue lifing framework , 2011 .
[18] Lorrie Molent. Fatigue crack growth from flaws in combat aircraft , 2010 .
[19] J. L. Rudd,et al. Quantification of Fastener- Hole Quality , 1978 .
[20] Fatigue cracking from a corrosion pit in an aircraft bulkhead , 2014 .