Current water main rehabilitation practice using trenchless technology

The market for water infrastructure rehabilitation is growing rapidly due to the increasing age of underground utilities. Currently, two common water main rehabilitation methods exist: cured-in-place pipe (CIPP) and polymer spray-on coatings. CIPP can provide structural support for both internal and external loads, while spray-on techniques provide chemical resistance as well as adding minor strength to the existing pipe. This paper summarizes water main rehabilitation practice using CIPP and spray-on methods. The history of trenchless rehabilitation technology is discussed, as well as current methodologies and products for water mains. The design, installation, and monitoring of water main rehabilitation products are also summarized, along with the associated risks. Quality assurance and control (QA/QC) methods are included for evaluating existing products and procedures.

[1]  Neil S. Grigg,et al.  Data and Analytics Combat Water Main Failures , 2019, Journal AWWA.

[2]  John C. Matthews,et al.  A pilot study for retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation of municipal gravity sewers , 2014 .

[3]  Erez N. Allouche,et al.  Experimental and numerical evaluation of the impact of folds on the pressure rating of CIPP liners , 2007 .

[4]  Tom Iseley,et al.  Water Pipeline Renewal Evaluation Using AWWA Class IV CIPP, Pipe Bursting, and Open-Cut , 2011 .

[5]  A Comparison of Cured-In-Place Pipe (CIPP) Mechanical Properties: Laboratory vs. Field-Manufactured , 2008 .

[6]  John C. Matthews,et al.  Demonstration and evaluation of an innovative water main rehabilitation technology: Cured-in-Place Pipe (CIPP) lining , 2012 .

[7]  A. A. Estelle,et al.  Drinking water lead regulations: impact on the brass value chain , 2016 .

[8]  Sanjiv Gokhale,et al.  Pipelines 2008 : Pipeline Asset Management: Maximizing Performance of our Pipeline Infrastructure , 2008 .

[9]  Identifying Emerging Issues from the Perspective of the Small Island Developing States Expert Group Meeting co-hosted by United Nations Environment Program (UNEP) and the United Nations Department of Economic and Social Affairs (DESA) , 2013 .

[10]  K. Vairavamoorthy,et al.  Multi-criteria Decision Analysis: A Strategic Planning Tool for Water Loss Management , 2011 .

[11]  L. Bláha,et al.  Drinking water contaminants from epoxy resin-coated pipes: A field study. , 2016, Water research.

[12]  Neil S. Grigg,et al.  Assessment and Renewal of Water Distribution Systems , 2005 .

[13]  Garrick E Louis,et al.  Risk and opportunity in upgrading the US drinking water infrastructure system. , 2008, Journal of environmental management.

[14]  George Bontus Implementing Water Main Renovation , 2008 .

[15]  A. Riahi Short-Term and Long-Term Mechanical Properties of CIPP Liners , 2015 .

[16]  John C. Matthews,et al.  Innovative research program on the renewal of aging water infrastructure systems , 2015 .

[17]  Guangtao Fu,et al.  Reliable, resilient and sustainable water management: the Safe & SuRe approach , 2016, Global challenges.

[18]  Ariamalar Selvakumar,et al.  Quality assurance and quality control practices for rehabilitation of sewer and water mains , 2012 .

[19]  Mark A. Knight,et al.  Cleaning of Pressure Pipes with Novel Technology - The Importance of Long-Term Bond , 2013 .

[20]  David J. Beale,et al.  Estimating the Cost and Carbon Impact of a Long Term Water Main Rehabilitation Strategy , 2013, Water Resources Management.

[21]  John Mann,et al.  Stae of the Industry Report 2005: A Guide for Good Health , 2005 .

[22]  Gary A. Burlingame,et al.  Revision of AWWA C651‐14: The Water Main Disinfection Standard , 2015 .

[23]  John C. Matthews,et al.  Innovative rehabilitation technology demonstration and evaluation program , 2014 .