Implementing a Production Schedule at LKAB's Kiruna Mine
暂无分享,去创建一个
[1] Robert Underwood,et al. A mathematical programming viewpoint for solving the ultimate pit problem , 1998, Eur. J. Oper. Res..
[2] Martin L. Smith. Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX , 1998 .
[3] Brian W. Kernighan,et al. AMPL: A Modeling Language for Mathematical Programming , 1993 .
[4] W. Matthew Carlyle,et al. Underground Planning at Stillwater Mining Company , 2001, Interfaces.
[5] B. M. Winkler. Mine production scheduling using linear programming and virtual reality , 1998 .
[6] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.
[7] Robert Underwood,et al. A scheduling algorithm for open pit mines , 1996 .
[8] Torgny Almgren,et al. An approach to long range production and development planning with application to the Kiruna Mine, Sweden , 1994 .