An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study
暂无分享,去创建一个
[1] Ming Sun,et al. Cost and time control of construction projects: inhibiting factors and mitigating measures in practice , 2010 .
[2] Sheryl Staub-French,et al. 3D and 4D modeling for design and construction coordination: issues and lessons learned , 2007, J. Inf. Technol. Constr..
[3] I-Chen Wu,et al. A framework for facilitating multi-dimensional information integration, management and visualization in engineering projects , 2012 .
[4] Sang-Chul Kim,et al. Project success indicators focusing on residential projects: Are schedule performance index and cost performance index accurate measures in earned value? , 2009 .
[5] Clyde B. Tatum,et al. Improving Constructibility during Conceptual Planning , 1987 .
[6] Burcin Becerik-Gerber,et al. Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery , 2010 .
[7] Mikhail Chester,et al. Cost Impacts, Scheduling Impacts, and the Claims Process during Construction , 2005 .
[8] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[9] Tetsuya Miyagawa. Construction manageability planning — A system for manageability analysis in construction planning , 1997 .
[10] Simaan M. AbouRizk,et al. Role of Simulation in Construction Engineering and Management , 2010 .
[11] A.A.D.A.J. Perera,et al. An integrated construction project cost information system using MS Access™ and MS Project™ , 2004 .
[12] Quentin W. Fleming,et al. Earned Value Project Management , 1996 .
[13] Hung-Ming Chen,et al. Visualized EVM system for assessing project performance , 2010 .
[14] Chung-Wei Feng,et al. Using the MD CAD model to develop the time–cost integrated schedule for construction projects , 2010 .
[15] Jui-Sheng Chou,et al. Cost simulation in an item-based project involving construction engineering and management , 2011 .
[16] Wayne M. Stevens. Cost Control: Integrated Cost/Schedule Performance , 1986 .
[17] Thomas E. Glavinich,et al. Improving Constructability during Design Phase , 1995 .
[18] Kenneth T. Sullivan,et al. How To Measure the Benefits of BIM - A Case Study Approach , 2012 .
[19] Frédéric Bosché,et al. Toward Automated Earned Value Tracking Using 3D Imaging Tools , 2013 .
[20] Faisal Manzoor Arain,et al. Learning construction project management in the virtual world: leveraging on second life , 2011, J. Inf. Technol. Constr..
[21] Brian Wilson,et al. Investigating first planning in construction , 2006 .
[22] Yassir AbdelRazig,et al. A Framework for Real-Time Construction Project Progress Tracking , 2006 .
[23] Agata Czarnigowska. Earned value method as a tool for project control , 2008 .