Process simulation of a dual-stage Selexol unit for pre-combustion carbon capture at an IGCC power plant
暂无分享,去创建一个
Stefano Brandani | Zoe Kapetaki | Hyungwoong Ahn | Pietro Brandani | S. Brandani | H. Ahn | P. Brandani | Z. Kapetaki
[1] Edward S. Rubin,et al. Cost and performance of fossil fuel power plants with CO2 capture and storage , 2007 .
[2] D. Bhattacharyya,et al. Steady-State Simulation and Optimization of an Integrated Gasification Combined Cycle Power Plant with CO2 Capture , 2011 .
[3] Stefano Brandani,et al. Detailed process simulation of pre-combustion IGCC plants using coal-slurry and dry coal gasifiers , 2013 .
[4] R. L. Schendel,et al. Comparison of fluor solvent and selexol processes , 1984 .
[5] Stefano Consonni,et al. Shift Reactors and Physical Absorption for Low-CO2 Emission IGCCs , 1998 .
[6] Edward S. Rubin,et al. CO2 control technology effects on IGCC plant performance and cost , 2009 .
[7] William L. Luyben,et al. Integrated Gasification Combined Cycle Dynamic Model: H2S Absorption/Stripping, Water−Gas Shift Reactors, and CO2 Absorption/Stripping , 2010 .
[8] L. Hepler,et al. Solubilities of carbon dioxide, hydrogen sulfide and sulfur dioxide in physical solvents , 1992 .
[9] Calin-Cristian Cormos,et al. Integrated assessment of carbon capture and storage technologies in coal-based power generation using CAPE tools , 2012 .
[10] Lora L Pinkerton,et al. Cost and Performance Baseline for Fossil Energy Plants Volume 1a: Bituminous Coal (PC) and Natural Gas to Electricity Revision 3 , 2011 .
[11] Richard D. Doctor,et al. KRW oxygen-blown gasification combined cycle: Carbon dioxide recovery, transport, and disposal , 1996 .
[12] L. Lyddon,et al. A COMPARISON OF PHYSICAL SOLVENTS FOR ACID GAS REMOVAL , 2008 .
[13] Calin-Cristian Cormos,et al. Pre-combustion carbon dioxide capture by gas-liquid absorption for Integrated Gasification Combined Cycle power plants , 2012 .