Freezing the master production schedule in multilevel material requirements planning systems under deterministic demand

Abstract This paper extends the studies by Sridharan, Berry, and Udayabhanu from single-level MPS systems to multilevel material requirements planning (MRP) systems, and examines the impact of product structure, lot-sizing rules and cost parameters upon the selection of MPS freezing parameters under deterministic demand. A model is built to simulate the master production scheduling and material requirements planning operations in a make-to-order environment. The results show that all the MPS freezing parameters studied have a significant impact upon total inventory costs and schedule instability in multilevel MRP systems. First, the order-based freezing method is preferable to the period-based method. Secondly, the study finds that increasing the freezing proportion reduces both total inventory costs and schedule instability. This finding contradicts the finding by Sridharan et al. in single-level systems. Thirdly, the study finds that a higher replanning periodicity results in both lower total inventory ...

[1]  Joseph D. Blackburn,et al.  The impact of a rolling schedule in a multi-level MRP system , 1982 .

[2]  Neng-Pai Lin,et al.  A Model for Master Production Scheduling in Uncertain Environments , 1992 .

[3]  Dean H. Kropp,et al.  A Lot-Sizing Algorithm for Reducing Nervousness in MRP Systems , 1984 .

[4]  Dean H. Kropp,et al.  HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS , 1983 .

[5]  W. C. Benton,et al.  PRODUCT STRUCTURE COMPLEXITY AND MULTILEVEL LOT SIZING USING ALTERNATIVE COSTING POLICIES , 1985 .

[6]  H Mather,et al.  Reschedule the reschedules you just rescheduled - Way of life for MRP? , 1977 .

[7]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Demand Uncertainty , 1990 .

[8]  William L. Berry,et al.  MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .

[9]  Xiande Zhao,et al.  Freezing the master production schedule for material requirements planning systems under demand uncertainty , 1993 .

[10]  Joseph D. Blackburn,et al.  HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* , 1980 .

[11]  Dean H. Kropp,et al.  THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING , 1982 .

[12]  Urban Wemmerlöv,et al.  The behavior of lot-sizing procedures in the presence of forecast errors , 1989 .

[13]  Dean H. Kropp,et al.  MRP system nervousness: Causes and cures , 1985 .

[14]  L. V. Wassenhove,et al.  COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING , 1983 .

[15]  Kenneth R. Baker,et al.  AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING , 1977 .

[16]  Gerard M. Campbell Master Production Scheduling Under Rolling Planning Horizons with Fixed Order Intervals , 1992 .

[17]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[18]  Everett E. Adam,et al.  Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .

[19]  Joseph D. Blackburn,et al.  Improved heuristics for multistage requirements planning systems , 1982 .

[20]  Joseph A. Orlicky,et al.  Material Requirements Planning: The New Way of Life in Production and Inventory Management , 1975 .

[21]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Rolling Planning Horizons , 1987 .

[22]  R. C. Carlson,et al.  Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .

[23]  Urban Wemmerlöv,et al.  Lot-sizing under uncertainty in a rolling schedule environment , 1984 .