A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
暂无分享,去创建一个
[1] Yu Xu,et al. Multi-mode project payment scheduling problems with bonus-penalty structure , 2008, Eur. J. Oper. Res..
[2] Ali Kaveh,et al. Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization , 2009 .
[3] Amir Abbas Najafi,et al. Using Multi-Objective Particle Swarm Optimization for Bi-objective Multi-Mode Resource-Constrained Project Scheduling Problem , 2011 .
[4] Mohan M. Kumaraswamy,et al. Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization , 2005 .
[5] Shui Tai Xu. Applying Ant Colony System to Solve Construction Time-Cost Tradeoff Problem , 2011 .
[6] Chandrasekharan Rajendran,et al. A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs , 2005, Eur. J. Oper. Res..
[7] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[8] Bashiri Mahdi,et al. Metaheuristic Based Multiple Response Process Optimization , 2011 .
[9] Wei-neng Chen,et al. A Monte-Carlo ant colony system for scheduling multi-mode projects with uncertainties to optimize cash flows , 2010, IEEE Congress on Evolutionary Computation.
[10] R. Tavakkoli-Moghaddam,et al. A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS , 2008 .
[11] Önder Halis Bettemir,et al. A hybrid genetic algorithm for the discrete time-cost trade-off problem , 2012, Expert Syst. Appl..
[12] Amir Abbas Najafi,et al. Solving multi-mode resource-constrained project scheduling problem using two multi objective evolutionary algorithms , 2012 .
[13] Navid Bazrkar,et al. Task Scheduling for Computational Grids Using NSGA II with Fuzzy Variance Based Crossover , 2013 .
[14] Mohammad Khalilzadeh,et al. A Scatter Search Algorithm for the RCPSP with Discounted Weighted Earliness-Tardiness Costs , 2011 .
[15] Ying Xiong,et al. Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off , 2008 .
[16] Lothar Thiele,et al. Comparison of Multiobjective Evolutionary Algorithms: Empirical Results , 2000, Evolutionary Computation.
[17] Gündüz Ulusoy,et al. An equitable approach to the payment scheduling problem in project management , 2000, Eur. J. Oper. Res..
[18] R. Padman,et al. Heuristic scheduling of capital constrained projects , 1996 .
[19] Cengiz Haksever,et al. Flexible Model for Time'Cost Tradeoff Problem , 2004 .
[20] Chung-Hsing Yeh,et al. Resource-constrained project scheduling with fuzziness , 2001 .
[21] Rolf H. Möhring,et al. Linear preselective policies for stochastic project scheduling , 2000, Math. Methods Oper. Res..
[22] Rema Padman,et al. Project Contracts and Payment Schedules: The Client's Problem , 2001, Manag. Sci..
[23] Luis A. Bastidas,et al. Multiobjective particle swarm optimization for parameter estimation in hydrology , 2006 .
[24] Philippe Fortemps,et al. A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[25] Nicolai Siemens. A Simple CPM Time-Cost Tradeoff Algorithm , 1971 .
[26] Erik Demeulemeester,et al. Project network models with discounted cash flows a guided tour through recent developments , 1997, Eur. J. Oper. Res..
[27] Seyed Taghi Akhavan Niaki,et al. A genetic algorithm for resource investment problem with discounted cash flows , 2006, Appl. Math. Comput..
[28] Ario Ohsato,et al. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty , 2008 .
[29] Mitsuo Gen,et al. Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling , 2003, Appl. Soft Comput..
[30] Khaled A El-Rayes,et al. Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .
[31] Chung-Wei Feng,et al. Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method , 1995 .
[32] R Tavakoli Moghadam,et al. A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models , 2008 .
[33] Richard F. Hartl,et al. Nature-inspired metaheuristics for multiobjective activity crashing , 2008 .
[34] Shu-Shun Liu,et al. Resource-constrained construction project scheduling model for profit maximization considering cash flow , 2008 .
[35] Jongyul Kim,et al. A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem , 2012 .
[37] Abbas Afshar,et al. DISCOUNTED CASH FLOW TIME-COST TRADE-OFF PROBLEM OPTIMIZATION, ACO APPROACH , 2011 .
[38] Grzegorz Waligóra,et al. Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models , 2005, Eur. J. Oper. Res..
[39] Lothar Thiele,et al. Comparison of Multiobjective Evolutionary Algorithms: Empirical Results , 2000, Evolutionary Computation.
[40] Osama Moselhi,et al. Schedule compression using the direct stiffness method , 1993 .