Calcium Looping for CO2 Capture in Cement Plants – Pilot Scale Test
暂无分享,去创建一个
[1] Fabio Montagnaro,et al. Calcium looping spent sorbent as a limestone replacement in the manufacture of portland and calcium sulfoaluminate cements. , 2015, Environmental science & technology.
[2] Y Li,et al. CO2 emissions reduction potential in China's cement industry compared to IEA's Cement Technology Roadmap up to 2050 , 2014 .
[3] M. E. Diego,et al. Biomass combustion with in situ CO2 capture by CaO in a 300 kWth circulating fluidized bed facility , 2014 .
[4] Juan Carlos Abanades,et al. Analysis of a process to capture the CO2 resulting from the pre-calcination of the limestone feed to a cement plant , 2009 .
[5] P. Fennell,et al. Investigation into potential synergy between power generation, cement manufacture and CO2 abatement using the calcium looping cycle , 2011 .
[6] Stefano Brandani,et al. Process integration of a Ca-looping carbon capture process in a cement plant , 2013 .
[7] Ajay R. Bidwe,et al. Development of the calcium looping CO2 capture technology from lab to pilot scale at IFK, University of Stuttgart , 2014 .
[8] Paul S. Fennell,et al. The calcium looping cycle for large-scale CO2 capture , 2010 .
[9] J Carlos Abanades,et al. CO₂ capture from cement plants using oxyfired precalcination and/or calcium looping. , 2012, Environmental science & technology.
[10] Panagiotis Grammelis,et al. Integration of calcium looping technology in existing cement plant for CO2 capture: Process modeling and technical considerations , 2015 .
[11] Jochen Ströhle,et al. Carbonate looping experiments in a 1 MWth pilot plant and model validation , 2014 .
[12] A. Sánchez-Biezma,et al. Demonstration of steady state CO2 capture in a 1.7 MWth Calcium looping pilot , 2013 .