A distributed approach for space system formation operation autonomous planning and scheduling
暂无分享,去创建一个
A. Ercoli Finzi | Roberto Armellin | A. Brambilla | M. Lavagna | R. Armellin | A. Brambilla | M. Lavagna | A. Finzi
[1] A. Ercoli Finzi,et al. Distributed Planning and Scheduling for Space System Flotillas , 2005 .
[2] P. Pardalos,et al. An exact algorithm for the maximum clique problem , 1990 .
[3] Rina Dechter,et al. Temporal Constraint Networks , 1989, Artif. Intell..
[4] Makoto Yokoo,et al. Algorithms for Distributed Constraint Satisfaction: A Review , 2000, Autonomous Agents and Multi-Agent Systems.
[5] Nicola Muscettola,et al. Integrating Planning and Scheduling , 1993 .
[6] J. How,et al. Relative Dynamics and Control of Spacecraft Formations in Eccentric Orbits , 2000 .
[7] Lluís Vila,et al. A Survey on Temporal Reasoning in Artificial Intelligence , 1994, AI Communications.
[8] Nicola Muscettola,et al. HSTS: Integrating Planning and Scheduling , 1993 .
[9] Rosella Gennari. Temporal reasoning and constraint programming , 1998 .
[10] Makoto Yokoo,et al. The Distributed Constraint Satisfaction Problem: Formalization and Algorithms , 1998, IEEE Trans. Knowl. Data Eng..
[11] Arthur E. Bryson,et al. Applied Optimal Control , 1969 .
[12] Walt Truszkowski,et al. MULTI-AGENT PLANNING AND SCHEDULING ENVIRONMENT FOR ENHANCED SPACECRAFT AUTONOMY , 1999 .
[13] Daniel S. Weld. An Introduction to Least Commitment Planning , 1994, AI Mag..
[14] J. Christopher Beck,et al. Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics , 2000, Artif. Intell..