Effects of delayed RCP trip during SBLOCA in PWR

Abstract After the Three Mile Island (TMI) accident, the issue of when to trip the Reactor Coolant Pumps (RCPs) in case of a Small Break Loss of Coolant Accident (SBLOCA) became very important. Several analyses were performed during the 1980s leading to the current Emergency Operating Procedures (EOPs). However these analyses have not been reviewed taking into account that several improvements have been performed in the last thirty years with respect to two phase-flow models, thermal–hydraulics codes and safety assessment methodologies. In this sense, this work has two main objectives: First of all, an assessment of the analyses carried out by Pressurizer Water Reactor (PWR) vendors after the TMI-2 accident with a model of Almaraz Nuclear Power Plant (NPP) for TRACE code (V 5.0 patch 1). On the other hand, Integrated Safety Assessment (ISA) methodology is applied to explore this matter. Such methodology has been developed by the Spanish Nuclear Safety Council (CSN) and it is an adequate method to perform analyses in nuclear safety in which the uncertainties in operator actuation time play an important role. The main conclusions obtained from this work are that, the current EOPs are adequate to manage a SBLOCA sequence in a suitable manner and that ISA methodology is a powerful tool that provides accurate information to the analyst in order to verify the robustness of the EOPs and to perform the safety assessment of both, deterministic and probabilistic safety analysis.