Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines

0377-2217/$ see front matter 2008 Elsevier B.V. A doi:10.1016/j.ejor.2008.07.004 * Corresponding author. Tel.: +3

[1]  Stefan Helber,et al.  Performance Analysis of Flow Lines with Non-Linear Flow of Material , 1999 .

[2]  Stanley B. Gershwin,et al.  An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking , 1987, Oper. Res..

[3]  Chun-Hsiung Lan,et al.  Two-stage production with unreliable machine and finite working hour capacity , 2001 .

[4]  Chun-Hsiung Lan,et al.  MULTISTAGE PRODUCTION WITH PROBABILISTIC DEMAND AND FINITE RESOURCE CAPACITY , 2003 .

[5]  Jan van der Wal,et al.  Simple bounds and monotonicity results for finite multi-server exponential tandem queues , 1989, Queueing Syst. Theory Appl..

[6]  Yohanan Arzi,et al.  Optimal design of flexible production lines with unreliable machines and infinite buffers , 1998 .

[7]  Ben Atkinson,et al.  Queueing theory in manufacturing systems analysis and design , 1993 .

[8]  Yves Dallery,et al.  An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers , 1988 .

[9]  B. Ancelin,et al.  Calcul de la productivité d'une ligne intégrée de fabrication: CALIF, un logiciel industriel basé sur une nouvelle heuristique , 1987 .

[10]  Kathryn E. Stecke,et al.  Throughput for Production Lines with Serial Work Stations and Parallel Service Facilities , 1996, Perform. Evaluation.

[11]  C. The throughput rate of multistation unreliable production lines , 2003 .

[12]  H. T. Papadopoulos,et al.  The throughput rate of multistation reliable production lines , 1993 .

[13]  Cathal Heavey,et al.  Approximate analysis of serial flow lines with multiple parallel-machine stations , 2007 .

[14]  H. T. Papadopoulos,et al.  A recursive algorithm for generating the transition matrices of multistation multiserver exponential reliable queueing networks , 2001, Comput. Oper. Res..