Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines
暂无分享,去创建一个
[1] Stefan Helber,et al. Performance Analysis of Flow Lines with Non-Linear Flow of Material , 1999 .
[2] Stanley B. Gershwin,et al. An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking , 1987, Oper. Res..
[3] Chun-Hsiung Lan,et al. Two-stage production with unreliable machine and finite working hour capacity , 2001 .
[4] Chun-Hsiung Lan,et al. MULTISTAGE PRODUCTION WITH PROBABILISTIC DEMAND AND FINITE RESOURCE CAPACITY , 2003 .
[5] Jan van der Wal,et al. Simple bounds and monotonicity results for finite multi-server exponential tandem queues , 1989, Queueing Syst. Theory Appl..
[6] Yohanan Arzi,et al. Optimal design of flexible production lines with unreliable machines and infinite buffers , 1998 .
[7] Ben Atkinson,et al. Queueing theory in manufacturing systems analysis and design , 1993 .
[8] Yves Dallery,et al. An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers , 1988 .
[9] B. Ancelin,et al. Calcul de la productivité d'une ligne intégrée de fabrication: CALIF, un logiciel industriel basé sur une nouvelle heuristique , 1987 .
[10] Kathryn E. Stecke,et al. Throughput for Production Lines with Serial Work Stations and Parallel Service Facilities , 1996, Perform. Evaluation.
[11] C.. The throughput rate of multistation unreliable production lines , 2003 .
[12] H. T. Papadopoulos,et al. The throughput rate of multistation reliable production lines , 1993 .
[13] Cathal Heavey,et al. Approximate analysis of serial flow lines with multiple parallel-machine stations , 2007 .
[14] H. T. Papadopoulos,et al. A recursive algorithm for generating the transition matrices of multistation multiserver exponential reliable queueing networks , 2001, Comput. Oper. Res..