Evaluation of Non-Parametric Selection Mechanisms in Evolutionary Computation: A Case Study for the Machine Scheduling Problem
暂无分享,去创建一个
[1] Nils Boysen,et al. A generalized classification scheme for crane scheduling with interference , 2017, Eur. J. Oper. Res..
[2] Changkyu Park,et al. A GRASP approach to transporter scheduling and routing at a shipyard , 2012, Comput. Ind. Eng..
[3] Christopher Rose,et al. Comparing four metaheuristics for solving a constraint satisfaction problem for ship outfitting scheduling , 2015 .
[4] Hans Kellerer,et al. Parallel dedicated machines scheduling with chain precedence constraints , 2012, Eur. J. Oper. Res..
[5] Alessandro Agnetis,et al. Scheduling three chains on two parallel machines , 2010, Eur. J. Oper. Res..
[6] Juraj Hromkovic,et al. Algorithmics for hard problems - introduction to combinatorial optimization, randomization, approximation, and heuristics , 2001 .
[7] Gisele L. Pappa,et al. Tuning Genetic Programming parameters with factorial designs , 2010, IEEE Congress on Evolutionary Computation.
[8] Maxim A. Dulebenets,et al. A comprehensive multi-objective optimization model for the vessel scheduling problem in liner shipping , 2018 .
[9] Maxim A. Dulebenets,et al. The green vessel scheduling problem with transit time requirements in a liner shipping route with Emission Control Areas , 2017 .
[10] M. A. Dulebenets,et al. The Vessel Scheduling Problem in a Liner Shipping Route with Heterogeneous Fleet , 2018 .
[11] Victor Fernandez-Viagas,et al. A new vision of approximate methods for the permutation flowshop to minimise makespan: State-of-the-art and computational evaluation , 2017, Eur. J. Oper. Res..
[12] Andrea Pacifici,et al. Scheduling assembly tasks with caterpillar precedence constraints on dedicated machines , 2017 .
[13] Pramod P. Khargonekar,et al. An Approximately Optimal Algorithm for Scheduling Phasor Data Transmissions in Smart Grid Networks , 2015, IEEE Transactions on Smart Grid.
[14] Chengbin Chu,et al. Exact and metaheuristic algorithms to minimize the total tardiness of cutting tool sharpening operations , 2018, Expert Syst. Appl..
[15] Jeng-Fung Chen,et al. Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints , 2006 .
[16] Jorge Ejarque,et al. Dynamic energy-aware scheduling for parallel task-based application in cloud computing , 2018, Future Gener. Comput. Syst..
[17] Jin Ye,et al. A genetic algorithm for minimizing makespan of block erection in shipbuilding , 2009 .
[18] Chris N. Potts,et al. Unrelated parallel machine scheduling using local search , 1994 .
[19] John Lu,et al. Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective , 2001 .
[20] Ghaith Rabadi,et al. Heuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times , 2006, J. Intell. Manuf..
[21] Frank Werner,et al. Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties , 2001 .
[22] F. Frank Chen,et al. Unrelated parallel machine scheduling with setup times using simulated annealing , 2002 .
[23] Pei-Chann Chang,et al. Scheduling of drilling operations in printed circuit board factory , 2003 .
[24] F. Frank Chen,et al. Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective , 2003 .
[25] Changkyu Park,et al. A GRASP approach to transporter scheduling for ship assembly block operations management , 2013 .
[26] W L Pearn,et al. Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions , 2004, J. Oper. Res. Soc..
[27] Ioannis Caragiannis,et al. Efficient Coordination Mechanisms for Unrelated Machine Scheduling , 2009, Algorithmica.
[28] Nathalie Sauer,et al. Heuristics for unrelated machine scheduling with precedence constraints , 1997 .
[29] Amos Fiat,et al. On-line routing of virtual circuits with applications to load balancing and machine scheduling , 1997, JACM.
[30] Rubén Ruiz,et al. A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times , 2011, Eur. J. Oper. Res..
[31] Maxim A. Dulebenets. Application of Evolutionary Computation for Berth Scheduling at Marine Container Terminals: Parameter Tuning Versus Parameter Control , 2018, IEEE Transactions on Intelligent Transportation Systems.
[32] Lars Mönch,et al. Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times , 2011, Comput. Ind. Eng..
[33] Xiaofeng Hu,et al. Minimising makespan on parallel machines with precedence constraints and machine eligibility restrictions , 2010 .