REFLECTIONS ON THE OPERATION OF THE NATIONAL POWER SYSTEM AFTER THE INTERCONNECTION WITH THE UCTE

The interconnection of the national power system with the UCTE has been successfully achieved after the completion of the preparation and test programme. Reliable and efficient operation, interconnected, in the context of the electricity market is influenced by the National Energy Strategy, which must be consistent with the European Strategy, while adapted to the concrete circumstances of Romania, and take into account the global restraints We must have our children and grand-children in mind when we design the "energy future of Romania".