SIM system testbed: 3-baseline stellar interferometer on a 9-meter-long flexible structure
暂无分享,去创建一个
[1] Renaud Goullioud,et al. Dual stage passive vibration isolation for optical interferometer missions , 2003, SPIE Astronomical Telescopes + Instrumentation.
[2] Robert A. Laskin. SIM technology development overview: light at the end of the tunnel , 2003, SPIE Astronomical Telescopes + Instrumentation.
[3] James C. Marr,et al. Space interferometry mission (SIM): overview and current status , 2003, SPIE Astronomical Telescopes + Instrumentation.
[4] Renaud Goullioud,et al. Microprecision interferometer: scorecard on technology readiness for the Space Interferometer Mission , 2000, Astronomical Telescopes and Instrumentation.
[5] O.S. Alvarez-Salazar,et al. Space Interferometry Mission System testbed-3: external metrology inversion , 2004, 2004 IEEE Aerospace Conference Proceedings (IEEE Cat. No.04TH8720).
[6] Bijan Nemati,et al. On path feed forward performance of an astrometric 3-BL interferometer test bed (STB-3): mitigating atmospheric effects , 2002 .
[7] Thomas G. Lockhart. RTC: a distributed realtime control system toolkit , 2002, SPIE Astronomical Telescopes + Instrumentation.