Optimal two-stage lot sizing and inventory batching policies
暂无分享,去创建一个
[1] Vincent A. Mabert,et al. Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems , 1995 .
[2] George Schussel. Job-Shop Lot Release Sizes , 1968 .
[3] Andrew Z. Szendrovits,et al. Note-Comments on the Optimality in Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1981 .
[4] Leroy B. Schwarz,et al. Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1975 .
[5] Jatinder N. D. Gupta,et al. Determining lot sizes and resource requirements: A review , 1987 .
[6] A. Z. Szendrovits. Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .
[7] A. Z. Szendrovits,et al. Optimizing multi-stage production with constant lot size and varying numbers of batches , 1980 .
[8] Iftekhar A. Karimi. Optimal cycle times in multistage serial systems with set-up and inventory costs , 1992 .
[9] Jatinder N. D. Gupta,et al. OR Practice - Determining Lot Sizes and Resource Requirements: A Review , 1987, Oper. Res..
[10] P. A. Jensen,et al. Scheduling in a Multistage Production System with Set-up and Inventory Costs , 1972 .
[11] J. Williams. Note-On the Optimality of Integer Lot Size Ratios in Economic Lot Size Determination in Multi-Stage Assembly Systems , 1982 .
[12] H. Taha,et al. The Economic Lot Sizes in Multistage Production Systems , 1970 .
[13] A. Z. Szendrovits. Non-inteǵer optimal lot size ratios in two-staǵe production/inventory systems , 1983 .
[14] I. Karimi. Optimal Cycle Times in a Two-Stage Serial System With Set-Up and Inventory Costs , 1989 .
[15] Ludo Gelders,et al. Production planning: a review , 1981 .