Kanban in Industrial Engineering and Software Engineering: A Systematic Literature Review
暂无分享,去创建一个
Muhammad Ovais Ahmad | Jouni Markkula | Markku Oivo | Bolaji Adeyemi | M. Oivo | M. Ahmad | Jouni Markkula | Bolaji Adeyemi
[1] Stephen C. Graves,et al. Little's Law , 2008 .
[2] Taiichi Ohno,et al. Toyota Production System : Beyond Large-Scale Production , 1988 .
[3] I. A. Kouri,et al. The Principles and Planning Process of an Electronic Kanban System , 2008 .
[4] Yves Dallery,et al. A unified framework for pull control mechanisms in multi‐stage manufacturing systems , 2000, Ann. Oper. Res..
[5] Mira Kajko-Mattsson,et al. Developer-driven big-bang process transition from Scrum to Kanban , 2011, ICSSP '11.
[6] Richard A. Johnson,et al. Transforming a traditional manufacturing system into a just-in-time system with kanban , 1988, WSC '88.
[7] Feryal Erhun,et al. An overview of design and operational issues of kanban systems , 1999 .
[8] P. A. Fearon. Inventory Controlled Environment (I.C.E.) Just-In-Time at National Semiconductor , 1993, Proceedings. IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop.
[9] Muhammad Ovais Ahmad,et al. Usage of Kanban in Software Companies An empirical study on motivation, benefits and challenges , 2014, ICSEA 2014.
[10] Pearl Brereton,et al. Performing systematic literature reviews in software engineering , 2006, ICSE.
[11] Marc Gravel,et al. Using the Kanban in a job shop environment , 1988 .
[12] Yuehwern Yih,et al. Determining the number of kanbans and lotsizes in a generic kanban system : a simulated annealing approach , 1994 .
[13] Dag I. K. Sjøberg,et al. Quantifying the Effect of Using Kanban versus Scrum: A Case Study , 2012, IEEE Software.
[14] Donald R. Smith,et al. Understanding the fundamentals of Kanban and CONWIP pull systems using simulation , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).
[15] James Miller,et al. The kanban approach, between agility and leanness: a systematic review , 2014, Empirical Software Engineering.
[16] Khaled Elleithy,et al. Novel Algorithms and Techniques In Telecommunications, Automation and Industrial Electronics , 2008 .
[17] Tarun Gupta,et al. An empirical study of just‐in‐time and total quality management principles implementation in manufacturing firms in the USA , 1997 .
[18] S. Kotani. Optimal method for changing the number of kanbans in the e -Kanban system and its applications , 2007 .
[19] Gabriel R. Bitran,et al. A mathematical programming approach to a deterministic Kanban system , 1987 .
[20] C. Sendil Kumar,et al. Literature review of JIT-KANBAN system , 2007 .
[21] Katsuhiko Takahashi,et al. Decentralized reactive Kanban system , 2002, Eur. J. Oper. Res..
[22] Oisín Cawley,et al. "Leagile" software development: An experience report analysis of the application of lean approaches in agile software development , 2012, J. Syst. Softw..
[23] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[24] Surendra M. Gupta,et al. Flexible kanban system , 1999 .
[25] Maria Di Mascolo,et al. On the design of generalized kanban control systems , 1995 .
[26] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[27] Jaroslav Prochazka. Agile Support and Maintenance of IT Services , 2010, ISD.
[28] Yves Dallery,et al. Extended kanban control system: combining kanban and base stock , 2000 .
[29] Y. Sugimori,et al. Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .
[30] Yannick Frein,et al. Comparison among three pull control policies: kanban, base stock, and generalized kanban , 2000, Ann. Oper. Res..
[31] Filippo Eros Pani,et al. A Review of Lean-Kanban Approaches in the Software Development , 2013 .
[32] Michele Marchesi,et al. Simulation of software maintenance process, with and without a work‐in‐process limit , 2013, J. Softw. Evol. Process..
[33] Daniela Cruzes,et al. Research synthesis in software engineering: A tertiary study , 2011, Inf. Softw. Technol..
[34] Surendra M. Gupta,et al. Material flow control and scheduling in a disassembly environment , 1998 .
[35] Jeffrey K. Liker,et al. Toyota Culture: The Heart and Soul of the Toyota Way , 2008 .
[36] Muhammad Ovais Ahmad,et al. Kanban in software development: A systematic literature review , 2013, 2013 39th Euromicro Conference on Software Engineering and Advanced Applications.
[37] Yannick Frein,et al. Unified Framework for Describing and Comparing the Dynamics of Pull Control Policies , 2004, Ann. Oper. Res..
[38] Yuehwern Yih,et al. Generic kanban systems for dynamic environments , 1994 .
[39] Andrew Kusiak,et al. Overview of Kanban systems , 1996 .