Reliability apportionment approach for spacecraft solar array using fuzzy reasoning Petri net and fuzzy comprehensive evaluation

Abstract The reliability apportionment of spacecraft solar array is of significant importance for spacecraft designers in the early stage of design. However, it is difficult to use the existing methods to resolve reliability apportionment problem because of the data insufficiency and the uncertainty of the relations among the components in the mechanical system. This paper proposes a new method which combines the fuzzy comprehensive evaluation with fuzzy reasoning Petri net (FRPN) to accomplish the reliability apportionment of the solar array. The proposed method extends the previous fuzzy methods and focuses on the characteristics of the subsystems and the intrinsic associations among the components. The analysis results show that the synchronization mechanism may obtain the highest reliability value and the solar panels and hinges may get the lowest reliability before design and manufacturing. Our developed method is of practical significance for the reliability apportionment of solar array where the design information has not been clearly identified, particularly in early stage of design.

[1]  David M. Nicol,et al.  Fluid stochastic Petri nets: Theory, applications, and solution techniques , 1998, Eur. J. Oper. Res..

[2]  Murat Uzam,et al.  The use of the Petri net reduction approach for an optimal deadlock prevention policy for flexible manufacturing systems , 2004 .

[3]  Yangmin Li,et al.  Real-Time Tip-Over Prevention and Path Following Control for Redundant Nonholonomic Mobile Modular Manipulators via Fuzzy and Neural-Fuzzy Approaches , 2006 .

[4]  Kyung S. Park Fuzzy Apportionment of System Reliability , 1987, IEEE Transactions on Reliability.

[5]  Tadao Murata,et al.  Petri nets: Properties, analysis and applications , 1989, Proc. IEEE.

[6]  Zhaoheng Liu,et al.  Reliability optimization using multiobjective ant colony system approaches , 2005, Reliab. Eng. Syst. Saf..

[7]  Hans S. Rauschenbach,et al.  Solar Cell Array Design Handbook: The Principles and Technology of Photovoltaic Energy Conversion , 1980 .

[8]  Julie A. Rodiek,et al.  Space solar array reliability: A study and recommendations , 2008 .

[9]  Senén Barro,et al.  Fuzzy reasoning supported by Petri nets , 1994, IEEE Trans. Fuzzy Syst..

[10]  James K. Byers,et al.  Reliability Growth Apportionment , 1977, IEEE Transactions on Reliability.

[11]  MengChu Zhou,et al.  Fuzzy reasoning Petri nets , 2003, IEEE Trans. Syst. Man Cybern. Part A.

[12]  Marvin Rausand,et al.  System Reliability Theory: Models, Statistical Methods, and Applications , 2003 .

[13]  Shaoze Yan,et al.  Reliability analysis method of a solar array by using fault tree analysis and fuzzy reasoning Petri net , 2011 .

[14]  Huang Hongzhong Reliability Analysis Method of Deployment Mechanism of a Satellite Solar Arrays , 2009 .

[15]  Massimiliano Pastena,et al.  Design of SmArT microsatellite deployable solar wings , 2000 .

[16]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[17]  A. Dhingra Optimal apportionment of reliability and redundancy in series systems under multiple objectives , 1992 .

[18]  Yong-Hua Song,et al.  Fault diagnosis of electric power systems based on fuzzy Petri nets , 2004 .

[19]  Nancy G. Leveson,et al.  Safety Analysis Using Petri Nets , 1987, IEEE Transactions on Software Engineering.

[20]  Michael R. Paige On Partitioning Program Graphs , 1977, IEEE Transactions on Software Engineering.

[21]  Jennifer R. Tanzman Material considerations in the STEREO solar array design , 2006 .

[22]  Donghua Zhou,et al.  Remaining useful life estimation - A review on the statistical data driven approaches , 2011, Eur. J. Oper. Res..

[23]  Ronald R. Yager,et al.  A reasoning algorithm for high-level fuzzy Petri nets , 1996, IEEE Trans. Fuzzy Syst..

[24]  Witold Pedrycz,et al.  A generalized fuzzy Petri net model , 1994, IEEE Trans. Fuzzy Syst..

[25]  M. Zuo,et al.  Genetic-algorithm-based optimal apportionment of reliability and redundancy under multiple objectives , 2009 .

[26]  Simon Wiedemann,et al.  Simulation of Deployment of a Flexible Solar Array , 2002 .