Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated by MIKE-11 model. In order to check whether or not the dam construction could affect the quality of the Gavi River, the physicochemical quality of the river water was also tested. Afterwards, a questionnaire was prepared containing an inventory of possible risks supposed to be induced by construction of Gavi Dam. The questionnaires were placed at disposal of experts to score the items based on their importance. The questionnaires were then analyzed using SPSS Software, version 16. According to which, a total number of 12 risk factors were identified. The dam construction risks were qualitatively assessed by preliminary hazard analysis. Based on the results, 3 of 12 identified risks were recognized unacceptable. The shortlisted risks were prioritized at final step using technique for order of preference by similarity to ideal solution. "Habitat fragmentation" with a weight of 0.3002, "water pollution" with a weight of 0.295, and "impacts on aquatics" with a weight of 0.293 were identified as three top priority flooding risks. Among the most important corrective measures for mitigation of the risks at construction phase can be pointed to "restoration of the land cover", “conservation of areas surrounding the dam as a new wildlife habitat", “prevention of water contamination”, and "conservation of fish spawning sites".

[1]  H. Tosun,et al.  Seismic hazard and total risk analyses for large dams in Euphrates basin, Turkey , 2007 .

[3]  David J. Leggett Lab-HIRA: Hazard identification and risk analysis for the chemical research laboratory: Part 1. Preliminary hazard evaluation , 2012 .

[4]  Bin Chen,et al.  Ecological risk assessment of hydropower dam construction based on ecological network analysis , 2010 .

[5]  A. R. Karbassi,et al.  Development of New Model for Computation of External Costs of Hydropower Dams , 2014 .

[6]  James J. Rooney,et al.  A preliminary hazards analysis of a fluid catalytic cracking unit complex , 1988 .

[7]  Seyed Ali Jozi,et al.  Safety, Health, and Environmental Risk Assessment of a Gas Power Plant: A Case Study from Southern Iran , 2015 .

[8]  Zheng Xin,et al.  Study on the Risk Assessment of the Tailings Dam Break , 2011 .

[9]  Jozi Seyed Ali,et al.  ENVIRONMENTAL RISK ASSESSMENT OF GOTVAND-OLIA DAM AT OPERATIONAL PHASE USING THE INTEGRATED METHOD OF ENVIRONMENTAL FAILURE MODE AND EFFECTS ANALYSIS (EFMEA) AND PRELIMINARY HAZARD ANALYSIS , 2014 .

[10]  Stephen Heller,et al.  Managing industrial risk--having a tested and proven system to prevent and assess risk. , 2006, Journal of hazardous materials.

[11]  Georgios D. Samaras,et al.  Assessing risk in Dam projects using AHP and ELECTRE I , 2014 .

[12]  Daniele Bocchiola,et al.  Safety of Italian dams in the face of flood hazard , 2014 .

[13]  Ehsan Goodarzi,et al.  Risk and uncertainty analysis for dam overtopping – Case study: The Doroudzan Dam, Iran , 2014 .

[14]  Seyed Ali Jozi,et al.  Environmental Risk Assessment of Dams in Construction Phase Using a Multi-Criteria Decision-Making (MCDM) Method , 2015 .

[15]  Gene Jiing-Yun You,et al.  An assessment of long-term overtopping risk and optimal termination time of dam under climate change. , 2013, Journal of environmental management.

[16]  Ignacio Escuder-Bueno,et al.  The suitability of risk reduction indicators to inform dam safety management , 2016 .

[17]  A. R. Karbassi,et al.  An Effective Participatory-Based Method for Dam Social Impact Assessment , 2012 .

[18]  Y. Xu,et al.  Analysis of earth dam failures: A database approach , 2009 .

[19]  J. Andrew Charles,et al.  DAM FAILURES: IMPACT ON RESERVOIR SAFETY LEGISLATION IN GREAT BRITAIN , 2012 .

[20]  M. Hanson,et al.  Hazard assessment for a pharmaceutical mixture detected in the upper Tennessee River using Daphnia magna , 2015 .

[21]  Miklas Scholz,et al.  Predicting dam failure risk for sustainable flood retention basins: A generic case study for the wider Greater Manchester area , 2012, Comput. Environ. Urban Syst..

[22]  Jozi Seyed Ali,et al.  Environmental Risk Assessment of Dams by Using Multi-Criteria Decision-Making Methods: A Case Study of the Polrood Dam, Guilan Province, Iran , 2014 .

[23]  Seyed Ali Jozi,et al.  Environmental risk assessment of low density polyethylene unit using the method of failure mode and effect analysis , 2012 .

[24]  M. Moore,et al.  Environmental Risk Assessment Study , 2006 .

[25]  Tehran Iran Quantification of Social Impacts of Large Hydropower Dams- a case study of Alborz Dam in Mazandaran Province, Northern Iran , 2013 .

[26]  Mike Wardman,et al.  Preliminary safety analysis , 1993 .

[27]  Benoit Robert,et al.  Dam Failure Risk: Its Definition and Impact on Safety Assessment of Dam Structures , 2002, J. Decis. Syst..

[28]  A. R. Karbassi,et al.  A CRITICAL LOOK AT SOCIAL IMPACT EVALUATION OF DAM CONSTRUCTION BY REVISED SIMPACTS SOFTWARE-A CASE STUDY OF ALBORZ DAM IN NORTHERN IRAN , 2014 .