Do Leading Indicators Lead Peaks More Than Troughs?

We develop a novel Markov switching vector autoregressive model to investigate the possibility that leading indicators have different lead times at business cycle peaks and at troughs. In this model, coincident and leading indicators share a common Markov state process, but their cycles are nonsynchronous, with the nonsynchronicity varying across regimes. An application shows that on average the Conference Board’s Composite Leading Index leads the Composite Coincident Index by nearly 1 year at peaks but by only 1 quarter at troughs. Allowing for asymmetric lead times yields improved real-time dating and forecasting of business cycle turning points.

[1]  Daniel E. Sichel Inventories and the three phases of the business cycle , 1994 .

[2]  James D. Hamilton Time Series Analysis , 1994 .

[3]  Dick van Dijk,et al.  Testing for Volatility Changes in U.S. Macroeconomic Time Series , 2004, Review of Economics and Statistics.

[4]  Seymour Geisser,et al.  A Bayes Approach for Combining Correlated Estimates , 1965 .

[5]  J. Stock,et al.  How Did Leading Indicator Forecasts Perform during the 2001 Recession? , 2003 .

[6]  Farshid Vahid,et al.  The missing link: using the NBER recession indicator to construct coincident and leading indices of economic activity , 2006 .

[7]  James D. Hamilton,et al.  What Do the Leading Indicators Lead , 1996 .

[8]  Massimiliano Marcellino,et al.  Leading Indicators: What Have We Learned? , 2005 .

[9]  Ataman Ozyildirim,et al.  A More Timely and Useful Index of Leading Indicators , 2003 .

[10]  S. Frühwirth-Schnatter Markov chain Monte Carlo Estimation of Classical and Dynamic Switching and Mixture Models , 2001 .

[11]  Marcelle Chauvet,et al.  An Econometric Characterization of Business Cycle Dynamics with Factor Structure and Regime Switching , 1998 .

[12]  Francis X. Diebold,et al.  Forecasting output with the composite leading index: an ex ante analysis , 1989 .

[13]  W. Wong,et al.  The calculation of posterior distributions by data augmentation , 1987 .

[14]  Adrian F. M. Smith,et al.  Bayesian computation via the gibbs sampler and related markov chain monte carlo methods (with discus , 1993 .

[15]  Peter M. Summers,et al.  How well do Markov switching models describe actual business cycles? The case of synchronization , 2005 .

[16]  Maximo Camacho,et al.  This is What Leading Indicators Lead , 2000 .

[17]  Arthur F. Burns,et al.  Statistical Indicators Of Cyclical Revivals , 1938 .

[18]  F. Diebold,et al.  Comparing Predictive Accuracy , 1994, Business Cycles.

[19]  L. Hurwicz,et al.  Measuring Business Cycles. , 1946 .

[20]  Michael P. Clements,et al.  Business Cycle Asymmetries , 2003 .

[21]  Michael D. Boldin A Check on the Robustness of Hamilton's Markov Switching Model Approach to the Economic Analysis of the Business Cycle , 1996 .

[22]  Arnold Zellner,et al.  An Introduction to Bayesian Inference in Econometrics. , 1974 .

[23]  Andrew J. Filardo How Reliable Are Recession Prediction Models , 1999 .

[24]  James D. Hamilton,et al.  Dating Business Cycle Turning Points , 2005 .

[25]  Donald Geman,et al.  Stochastic Relaxation, Gibbs Distributions, and the Bayesian Restoration of Images , 1984, IEEE Transactions on Pattern Analysis and Machine Intelligence.

[26]  John Geweke,et al.  Interpretation and inference in mixture models: Simple MCMC works , 2007, Comput. Stat. Data Anal..

[27]  Norman R. Swanson,et al.  Are Statistical Reporting Agencies Getting It Right? Data Rationality and Business Cycle Asymmetry , 2001 .

[28]  Margaret Mary McConnell,et al.  Output Fluctuations in the United States: What Has Changed Since the Early 1980s? , 1998 .

[29]  Chang‐Jin Kim,et al.  State-Space Models with Regime-Switching: Classical and Gibbs Sampling Approaches with Applications , 1999 .

[30]  James D. Hamilton A New Approach to the Economic Analysis of Nonstationary Time Series and the Business Cycle , 1989 .

[31]  Richard Paap,et al.  Bayes Estimates of Markov Trends in Possibly Cointegrated Series , 2002 .

[32]  S. Chib,et al.  Bayes inference via Gibbs sampling of autoregressive time series subject to Markov mean and variance shifts , 1993 .

[33]  R. McCulloch,et al.  STATISTICAL ANALYSIS OF ECONOMIC TIME SERIES VIA MARKOV SWITCHING MODELS , 1994 .

[34]  S. Chib Calculating posterior distributions and modal estimates in Markov mixture models , 1996 .

[35]  Glenn D. Rudebusch,et al.  Forecasting Output with the Composite Leading Index: A Real-Time Analysis , 1991 .

[36]  Marcelle Chauvet,et al.  A Comparison of the Real-Time Performance of Business Cycle Dating Methods , 2005 .

[37]  E. Pesavento,et al.  The Decline in U.S. Output Volatility , 2005 .

[38]  L. Tierney Markov Chains for Exploring Posterior Distributions , 1994 .

[39]  Andrew J. Filardo The 2001 Us Recession: What Did Recession Prediction Models Tell Us? , 2004 .

[40]  Andrew J. Filardo Business-Cycle Phases and Their Transitional Dynamics , 1994 .