Integrating mobile Building Information Modelling and Augmented Reality systems: An experimental study

Abstract The benefits of Building Information Modelling (BIM) have typically been tied to its capability to support information structuring and exchange through the centralization of information. Its increasing adoption and the associated ease of data acquisition has created information intensive work environments, which can result in information overload and thus negatively impact workers task efficiency during construction. Augmented Reality (AR) has been proposed as a mechanism to enhance the process of information extraction from building information models to improve the efficiency and effectiveness of workers' tasks. Yet, there is limited research that has evaluated the effectiveness and usability of AR in this domain. This research aims to address this gap and evaluate the effectiveness of BIM and AR system integration to enhance task efficiency through improving the information retrieval process during construction. To achieve this, a design science research approach was adopted that enabled the development and performance of a mobile BIM AR system (artefact) with cloud-based storage capabilities to be tested and evaluated using a portable desktop experiment. A total of 20 participants compared existing manual information retrieval methods (control group), with information retrieval through the artefact (non-control group). The results revealed that the participants using the artefact were approximately 50% faster in completing their experiment tasks, and committed less errors, when compared to the control group. This research demonstrates that a minor modification to existing information formats (2D plans) with the inclusion of Quick Response markers can significantly improve the information retrieval process and that BIM and AR integration has the potential to enhance task efficiency.

[1]  Ying Wang,et al.  Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry , 2014 .

[2]  Andrew Y. C. Nee,et al.  A comprehensive survey of augmented reality assembly research , 2016, Advances in Manufacturing.

[3]  Erik Brynjolfsson,et al.  Information, Technology and Information Worker Productivity , 2011, Inf. Syst. Res..

[4]  P. Love,et al.  A benefits realization management building information modeling framework for asset owners , 2014 .

[5]  Chimay J. Anumba,et al.  Ubiquitous location tracking for context-specific information delivery on construction sites , 2008 .

[6]  Martin Loosemore,et al.  Impediments to Reform in the Australian Building and Construction Industry , 2012 .

[7]  Wichian Premchaiswadi,et al.  QR-code generator , 2010, 2010 Eighth International Conference on ICT and Knowledge Engineering.

[8]  AttarzadehMeghdad,et al.  Precast workflow productivity measurement through BIM adoption , 2016 .

[9]  Peter E.D. Love,et al.  Augmented Reality in built environment: Classification and implications for future research , 2013 .

[10]  Hanbin Luo,et al.  A BIM-based construction quality management model and its applications , 2014 .

[11]  Hannele Kerosuo,et al.  Challenges of the expansive use of Building Information Modeling (BIM) in construction projects , 2015 .

[12]  Chandan Agarwala,et al.  Technology and Knowledge Worker Productivity , 2014 .

[13]  Žiga Turk,et al.  Component based engineering of a mobile BIM-based Augmented Reality system , 2014 .

[14]  Shamil Naoum,et al.  Factors influencing labor productivity on construction sites , 2016 .

[15]  Chimay J. Anumba,et al.  Collaborative project information management in a semantic web environment , 2008 .

[16]  Xiangyu Wang,et al.  Mixed Reality-Based Visualization Interfaces for Architecture, Engineering, and Construction Industry , 2005 .

[17]  P. Love,et al.  From justification to evaluation: Building information modeling for asset owners , 2013 .

[18]  Samir Chatterjee,et al.  A Design Science Research Methodology for Information Systems Research , 2008 .

[19]  Tomohiro Sato,et al.  Application of Digital Manuals with a Retinal Imaging Display in Manufacturing: Behavioral, Physiological, and Psychological Effects on Workers , 2015 .

[20]  Peter E.D. Love,et al.  Real time progress management: Re-engineering processes for cloud-based BIM in construction , 2015 .

[21]  Yusuf Arayici,et al.  Building Information Modelling (BIM) for Facilities Management (FM): The Mediacity Case Study Approach , 2012, Int. J. 3 D Inf. Model..

[22]  Erik Brynjolfsson,et al.  The productivity paradox of information technology , 1993, CACM.

[23]  Xiangyu Wang,et al.  A study on the benefits of augmented reality in retaining working memory in assembly tasks: A focus on differences in gender , 2013 .

[24]  Ömer Akin,et al.  Augmented reality-based computational fieldwork support for equipment operations and maintenance , 2011 .

[25]  Xiangyu Wang,et al.  Research trends and opportunities of augmented reality applications in architecture, engineering, and construction , 2013 .

[26]  Pamela J. Wisniewski,et al.  When more is too much: Operationalizing technology overload and exploring its impact on knowledge worker productivity , 2010, Comput. Hum. Behav..

[27]  Abdulsame Fazli,et al.  Appraising Effectiveness of Building Information Management (BIM) in Project Management , 2014 .

[28]  Peter E.D. Love,et al.  Design error reduction: toward the effective utilization of building information modeling , 2011 .

[29]  Robert W. Lindeman,et al.  A Systematic Review of Usability Studies in Augmented Reality between 2005 and 2014 , 2016, 2016 IEEE International Symposium on Mixed and Augmented Reality (ISMAR-Adjunct).

[30]  Xiangyu Wang,et al.  Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation , 2015, J. Comput. Civ. Eng..

[31]  Yong K. Cho,et al.  Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM , 2016 .

[32]  Guido L. Geerts,et al.  A design science research methodology and its application to accounting information systems research , 2011, Int. J. Account. Inf. Syst..

[33]  Frank Schultmann,et al.  Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .

[34]  Xiangyu Wang,et al.  Compatibility issues in Augmented Reality systems for AEC: An experimental prototype study , 2006 .

[35]  Feniosky Peña-Mora,et al.  Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry , 2011 .

[36]  J. Aken Management Research as a Design Science: Articulating the Research Products of Mode 2 Knowledge Production in Management , 2005 .

[37]  Peter E.D. Love,et al.  Using Animated Augmented Reality to Cognitively Guide Assembly , 2013, J. Comput. Civ. Eng..

[38]  Javier Irizarry,et al.  InfoSPOT: A mobile Augmented Reality method for accessing building information through a situation awareness approach , 2013 .

[39]  Andrew Y. C. Nee,et al.  Augmented reality applications in manufacturing: a survey , 2008 .

[40]  Thomas Olsson,et al.  Concepts and Subjective Measures for Evaluating User Experience of Mobile Augmented Reality Services , 2013 .

[41]  Daniel W. Mansson,et al.  BIM performance and capability , 2016 .