Integrating mobile Building Information Modelling and Augmented Reality systems: An experimental study
暂无分享,去创建一个
[1] Ying Wang,et al. Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry , 2014 .
[2] Andrew Y. C. Nee,et al. A comprehensive survey of augmented reality assembly research , 2016, Advances in Manufacturing.
[3] Erik Brynjolfsson,et al. Information, Technology and Information Worker Productivity , 2011, Inf. Syst. Res..
[4] P. Love,et al. A benefits realization management building information modeling framework for asset owners , 2014 .
[5] Chimay J. Anumba,et al. Ubiquitous location tracking for context-specific information delivery on construction sites , 2008 .
[6] Martin Loosemore,et al. Impediments to Reform in the Australian Building and Construction Industry , 2012 .
[7] Wichian Premchaiswadi,et al. QR-code generator , 2010, 2010 Eighth International Conference on ICT and Knowledge Engineering.
[8] AttarzadehMeghdad,et al. Precast workflow productivity measurement through BIM adoption , 2016 .
[9] Peter E.D. Love,et al. Augmented Reality in built environment: Classification and implications for future research , 2013 .
[10] Hanbin Luo,et al. A BIM-based construction quality management model and its applications , 2014 .
[11] Hannele Kerosuo,et al. Challenges of the expansive use of Building Information Modeling (BIM) in construction projects , 2015 .
[12] Chandan Agarwala,et al. Technology and Knowledge Worker Productivity , 2014 .
[13] Žiga Turk,et al. Component based engineering of a mobile BIM-based Augmented Reality system , 2014 .
[14] Shamil Naoum,et al. Factors influencing labor productivity on construction sites , 2016 .
[15] Chimay J. Anumba,et al. Collaborative project information management in a semantic web environment , 2008 .
[16] Xiangyu Wang,et al. Mixed Reality-Based Visualization Interfaces for Architecture, Engineering, and Construction Industry , 2005 .
[17] P. Love,et al. From justification to evaluation: Building information modeling for asset owners , 2013 .
[18] Samir Chatterjee,et al. A Design Science Research Methodology for Information Systems Research , 2008 .
[19] Tomohiro Sato,et al. Application of Digital Manuals with a Retinal Imaging Display in Manufacturing: Behavioral, Physiological, and Psychological Effects on Workers , 2015 .
[20] Peter E.D. Love,et al. Real time progress management: Re-engineering processes for cloud-based BIM in construction , 2015 .
[21] Yusuf Arayici,et al. Building Information Modelling (BIM) for Facilities Management (FM): The Mediacity Case Study Approach , 2012, Int. J. 3 D Inf. Model..
[22] Erik Brynjolfsson,et al. The productivity paradox of information technology , 1993, CACM.
[23] Xiangyu Wang,et al. A study on the benefits of augmented reality in retaining working memory in assembly tasks: A focus on differences in gender , 2013 .
[24] Ömer Akin,et al. Augmented reality-based computational fieldwork support for equipment operations and maintenance , 2011 .
[25] Xiangyu Wang,et al. Research trends and opportunities of augmented reality applications in architecture, engineering, and construction , 2013 .
[26] Pamela J. Wisniewski,et al. When more is too much: Operationalizing technology overload and exploring its impact on knowledge worker productivity , 2010, Comput. Hum. Behav..
[27] Abdulsame Fazli,et al. Appraising Effectiveness of Building Information Management (BIM) in Project Management , 2014 .
[28] Peter E.D. Love,et al. Design error reduction: toward the effective utilization of building information modeling , 2011 .
[29] Robert W. Lindeman,et al. A Systematic Review of Usability Studies in Augmented Reality between 2005 and 2014 , 2016, 2016 IEEE International Symposium on Mixed and Augmented Reality (ISMAR-Adjunct).
[30] Xiangyu Wang,et al. Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation , 2015, J. Comput. Civ. Eng..
[31] Yong K. Cho,et al. Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM , 2016 .
[32] Guido L. Geerts,et al. A design science research methodology and its application to accounting information systems research , 2011, Int. J. Account. Inf. Syst..
[33] Frank Schultmann,et al. Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .
[34] Xiangyu Wang,et al. Compatibility issues in Augmented Reality systems for AEC: An experimental prototype study , 2006 .
[35] Feniosky Peña-Mora,et al. Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry , 2011 .
[36] J. Aken. Management Research as a Design Science: Articulating the Research Products of Mode 2 Knowledge Production in Management , 2005 .
[37] Peter E.D. Love,et al. Using Animated Augmented Reality to Cognitively Guide Assembly , 2013, J. Comput. Civ. Eng..
[38] Javier Irizarry,et al. InfoSPOT: A mobile Augmented Reality method for accessing building information through a situation awareness approach , 2013 .
[39] Andrew Y. C. Nee,et al. Augmented reality applications in manufacturing: a survey , 2008 .
[40] Thomas Olsson,et al. Concepts and Subjective Measures for Evaluating User Experience of Mobile Augmented Reality Services , 2013 .
[41] Daniel W. Mansson,et al. BIM performance and capability , 2016 .